Steel Building Installation Guide: What Ships With the Kit and What Your Local Contractor Builds
Steel building installation guide for Xinguangzheng kits: construction drawings, an installation manual and free remote guidance ship with the building kit, and on-site installation guidance is an option. Scope depends on your site: your local contractor erects the steel, and the foundation is designed and built locally. We manufacture the frames and provide column base reaction data for your foundation designer.
Send the building type, width × length × eave height, your site country and whether you want on-site installation guidance, and we prepare a free layout, specification and itemized quote.
Installation manual, rolled construction drawings, a tabletSteel Building Installation Guide Scope: Provided, Optional and Not Included
Steel building installation guide scope falls into three columns, depending on what ships with the kit, what you add as an option and what stays outside the quote. On-site installation sits in the third column, so your local contractor carries it out. Each column is its own list, so read down one column at a time.
On-site installation is not included in the quote
Provided with the kit
- Construction drawings and installation manual
- Free remote guidance
- Column base reaction data for your foundation designer
- UT weld inspection report and photos
Available as options
- On-site installation guidance
- Insulation
- Crane rail system
- Facade design
Not included in the quote
- On-site installation
- Foundation design and construction
- Site preparation and local permits
- Sea freight, customs clearance, duties, taxes, insurance and inland transport
Who Does What: Installation Guidance From Us, Erection by Your Local Contractor
Site erection is carried out by your local contractor, while Xinguangzheng provides the shipped documents and free remote guidance, with on-site installation guidance available as an option. The six items below are what you confirm, receive and arrange, and their numbers index the items without setting an erection sequence.
We manufacture the structure your contractor erects: Q355B welded H-section main frames and galvanized Z / C purlins, made with laser plate cutting, welding robots and an automatic spraying line. Before cutting, the 3D model goes to you for confirmation, and the construction drawings, installation manual and UT report with photos ship with the steel. Free remote guidance comes with the kit, and its format and the questions it covers are not published on this page, so ask about both in your inquiry.
- 3D model confirmed by you before cutting
- Construction drawings and installation manual ship with the steel
- Column base reaction data for your foundation designer
- Free remote guidance
- Optional on-site installation guidance
- Erection by your local contractor
Foundation design and construction stay with your local team, and Xinguangzheng provides the column base reaction data for your foundation designer. When your local contractor can build from the construction drawings, installation manual and free remote guidance, on-site installation guidance is an option you can leave out. When you want someone on site, list on-site installation guidance in your inquiry and ask in writing who attends, how long, the cost and country coverage, which this page does not publish. Projects that need one supplier to build the foundation and erect the steel under a turnkey price do not fit kit supply, and this page gives no erection sequence or lifting plan.
Set the three columns above against your local contractor’s work package, then write your site country and any on-site installation guidance you want beside the building size. We return an itemized quote, so your contractor can check it against each column.
Check My Kit ScopeErection Overview and Packing Pages Next to Installation Guidance
The steel building installation guide on this page covers what arrives with the kit and who erects it locally, while the erection overview and the cargo details sit on the two pages below.
Installation Guidance Questions: Site Work, Foundation, Timing and Payment
Does the steel building installation guide mean Xinguangzheng erects the building?
No. On-site installation is outside the quote, and your local contractor erects the steel. A project that needs the supplier to build the foundation and erect the steel under one turnkey price is not a fit for kit supply, and neither is a building under 3,000 m². Hire a local erection contractor separately.
What is published about remote and on-site installation guidance?
Free remote guidance comes with the kit, and on-site installation guidance is an optional item. Format, staffing, duration, cost and country coverage for either one are not published on this page. State what you need in your inquiry and ask for a written description before you order.
How is the steel packed and checked before it ships?
Steel members are bundled on steel pallets in export packing, with a container loading plan. At the factory, main welds are ultrasonically tested and coating thickness is measured. The container type and loading plan are confirmed in the quote, along with whether the cargo ships in containers or as bulk.
Who is responsible for foundation design, and does the kit come with anchor bolts?
Your local team designs and builds the foundation, and Xinguangzheng provides column base reaction data for your foundation designer. Anchor bolt supply is confirmed in your quote. Pass the reaction data to your designer early, and ask about anchor bolts in your inquiry so local purchasing can be planned.
How long do production and the whole project take?
Production takes 15–40 days depending on tonnage, confirmed in the quote. A project typically runs 4–12 weeks overall, including local installation, and no separate erection duration is published. Cargo leaves Qingdao port, and sea transit days are confirmed for your destination port in the quote.
What do I send for a quote, and what moves the price?
The full input list sits in the closing section of this page, from building type and width × length × eave height to wind or snow exposure. Span, wind and snow loads, crane tonnage and local code move the price. Sea freight, customs clearance, duties and taxes sit outside the quote.
Which design code does the steel follow, and how long is it designed to last?
The design code follows the destination country and the project engineer, commonly AISC 360, EN 1993, AS 4100, AS/NZS 1170 or GB 50017. Frames are designed to the code that applies at your site. The buildings are designed for a 50-year service life, with maintenance as set out in the maintenance manual.
How is payment split, and what do I see before paying the balance?
Payment is by T/T or L/C, with a 30% deposit and the 70% balance paid before shipment. Before you pay the balance, Xinguangzheng sends the UT weld inspection report and photos, and third-party inspection is welcome. Arrange any third-party inspection when you request the quote.
Which quality system and certifications cover the steel?
Qingdao Xinguangzheng Steel Structure Co., Ltd. manufactures the steel under an ISO 9001:2015 system. The company is certified by the Canadian Welding Bureau to CSA W47.1 Division 1 and holds EN 1090 (CE) and EAC (GOST 23118-2019) certification. Certificate copies are available on request.
Send Your Building Size and Say Whether You Want On-Site Guidance
Shipments from Xinguangzheng have reached Africa, Latin America and the Caribbean, Oceania, South Asia, Southeast Asia and Europe. Annual capacity is up to 150,000 tonnes of steel structures across 12 production lines. Send the building type and use, width × length × eave height, site country and city, single or multi-span layout, crane tonnage, insulation, door and window count, mezzanine, and high wind or snow exposure. Add the on-site installation guidance you want, and we return a free, no-obligation quote with a layout, specification and full cost breakdown.