Steel Structure Fabrication for Export Metal Building Kits
We carry out steel structure fabrication for export metal building kits in four Xinguangzheng factories and ship from Qingdao Port. Production takes 15–40 days depending on tonnage, confirmed in your quote, and loads, spans and coatings follow the code that applies at your site.
Send the building type, width × length × eave height and site country, and we reply with a free, no-obligation quote with a layout, specification and full cost breakdown.

Steel Fabrication Facility: Four Factories and 12 Production Lines
For buyers checking steel structure fabrication capacity, Xinguangzheng runs four factories with 12 production lines on 150,000 m² (about 1.6 million sq ft) of factory space. Annual capacity is up to 150,000 tonnes of steel structures, and the company has 1,000+ employees. We manufacture the primary and secondary structure, roll-formed sheet in 11 profiles and lightweight wall panels.
| Subpage | What it covers | Evidence you can ask for |
|---|---|---|
![]() | Ultrasonic testing (UT) of main welds and coating thickness checks | UT report and photos |
![]() | CWB · CSA W47.1 Div.1, CE / EN 1090, EAC · GOST 23118-2019 and ISO 9001:2015, held by Qingdao Xinguangzheng Steel Structure Co., Ltd. | Certificate copies on request |

A local contractor is the simpler route for projects under 3,000 m² or for buyers who need one supplier to take on foundation and erection under a turnkey price.
Cutting, Beveling and Drilling
Laser plate cutting, profile cutting and marking, laser tube cutting, bevel milling and a large platform drill.
Welding and Bending
Welding robots and a large bending machine.
Roll Forming, Wall Panels and Coating
Roll forming in 11 sheet profiles, a lightweight wall panel line and an automatic spray line.
Steel Structure Fabrication Process: 3D Model Confirmation, Cutting, Welding, Coating, Inspection and Packing
Production for a fabrication order runs 15–40 days depending on tonnage, confirmed in your quote, and the whole project usually takes 4–12 weeks including consultation, 3D confirmation, prefabrication and local installation.

- 3D Modeling and ConfirmationTekla 3D modeling produces the shop drawings, and steel is cut only after the buyer confirms the 3D model.
- Cutting and DrillingPlates and sections are cut, beveled and drilled on laser, bevel-milling and platform-drill equipment.
- WeldingWelding robots join the steel, and the welding is covered by CWB · CSA W47.1 Div.1 from the Canadian Welding Bureau.
- Blasting and CoatingSteel is blasted to Sa2.5 and coated with epoxy zinc-rich primer on an automatic spray line, with hot-dip galvanizing as an option.
- InspectionMain welds are tested by ultrasonic testing (UT) and coating thickness is measured. The UT report and photos are sent before the final payment, and third-party inspection is welcome.
- Packing and ShipmentSteel is bundled on steel pallets with export packing and a container loading plan. Shipments leave Qingdao Port, about 1.5 hours from the factory, in 20′GP, 40′GP, 40′HQ or 40′OT containers or as bulk. Shop drawings, the installation manual and the UT report and photos go with the order, and sea transit time is confirmed in your quote by destination port.
Structural Steel Materials: Q355B H-Sections, Galvanized Purlins and Roll-Formed Panels
Structural steel materials for the main frame default to Q355B welded H-sections, with Q235B or Q460 available, and the grade for your project is confirmed in your quote. A single clear span is normally built up to 60 m with no interior columns, and spans up to 100 m are designed per project. We roll-form the roof and wall sheet and supply the sandwich-panel insulation core.
| Component | Material | Supply basis |
|---|---|---|
| Primary frame | Q355B welded H-section; Q235B or Q460 optional | Manufactured |
| Secondary structure | Galvanized Z and C purlins | Manufactured |
| Roof and wall | 0.5 mm profiled steel sheet; EPS, rock wool or PU sandwich panels optional | Sheet roll-formed, insulation core supplied |
Steel Structure Surface Treatment: Sa2.5 Blasting, Zinc-Rich Primer and Optional Galvanizing
Steel structure surface treatment starts with Sa2.5 blasting and an epoxy zinc-rich primer, applied on an automatic spray line. Coating thickness is measured at the factory before the steel ships.

When your project specification calls for galvanizing, hot-dip galvanizing is quoted as an option and the choice is confirmed in your quote.
Coatings, loads and spans are engineered to the code that applies at your site. Structures are designed for a 50-year service life, with maintenance as set out in the maintenance manual.
Tell us the coating you need, standard epoxy zinc-rich primer or hot-dip galvanizing, with the site country and project tonnage, and we confirm the coating approach in your quote.
Quote My CoatingFabrication FAQs: Factory, Inspection, Payment and Scope
Which parts of a steel structure fabrication package does Xinguangzheng make itself?
Xinguangzheng manufactures the primary and secondary structure, roll-formed sheet in 11 profiles and lightweight wall panels. Doors, windows, cranes, insulation cores and skylights are supplied. The buyer designs and builds the foundation locally, and Xinguangzheng provides the column base reaction data.
Can the factories handle my tonnage and delivery date?
Xinguangzheng has annual capacity of up to 150,000 tonnes of steel structures across four factories and 12 production lines. Capacity per factory or per line is not published here. Production takes 15–40 days depending on tonnage, confirmed in your quote.
What inspection evidence ships with the steel?
Main welds are tested by ultrasonic testing (UT) and coating thickness is measured before shipment. The UT report and photos travel with the shop drawings and the installation manual. Inspection ratios and tolerances are not published here, so ask for the inspection scope of your project when you request the quote.
Can a third party inspect before I pay the balance, and how is payment arranged?
Third-party inspection is welcome, and the UT weld test report and photos are sent before the final payment. Payment is by T/T or L/C, with a 30% deposit and the remaining 70% paid before shipment. Confirm your preferred payment method when you request the quote.
Can the coating be changed to hot-dip galvanizing?
Hot-dip galvanizing is available as an option alongside the standard Sa2.5 blasting and epoxy zinc-rich primer. Coatings are engineered to the code that applies at your site, and the galvanizing thickness is not published here. Tell us your project specification and site country when you request the quote, so the coating requirement is on record.
How long does fabrication take?
Production takes 15–40 days depending on tonnage, confirmed in your quote. A whole project usually takes 4–12 weeks, covering consultation, 3D model confirmation, factory prefabrication and local installation. Sea transit time depends on the destination port and is confirmed in your quote.
What is the minimum order, and which projects are not a good fit?
Projects start at 3,000 m². Smaller buildings are not a fit, nor are projects that need the supplier to build the foundation and erect the steel on site under a turnkey contract. For those, a local contractor is the simpler choice, because the kit is supplied without foundation or erection.
Which quality systems and certificates cover fabrication?
All products are controlled under an ISO 9001:2015 quality system, and welding is covered by CWB · CSA W47.1 Div.1. The company also holds CE / EN 1090, EAC · GOST 23118-2019, ISO 14001, ISO 45001 and China’s Grade I qualification for steel structure manufacturing. Certificate copies are available on request.
What does the quote include and exclude, and who handles installation?
The quote covers the steel structure, roof and wall panels, gutters and downspouts, bolts, accessories, shop drawings, the installation manual, export packing and a container loading plan. Foundation, on-site installation, sea freight, customs clearance, duties, taxes, insurance, inland transport, permits and site preparation are excluded. Free remote guidance supports your local contractor.
Send Building Size, Site Country and Coating Needs for a Steel Fabrication Quote
Send the building type, width × length × eave height, site country and crane tonnage, and we price your steel structure fabrication project against that brief. Cost moves with span, wind and snow load, crane tonnage and the code at your site, and with insulation, doors and windows and mezzanines.


