Steel Structure Fabrication for Export Metal Building Kits
We carry out steel structure fabrication for export metal building kits in six Xinguangzheng factories and ship from Qingdao Port. Production takes 15–40 days depending on tonnage, confirmed in your quote. Foundation and on-site installation are completed locally by the buyer.
Send the building type, width × length × eave height and site country, and we reply with a free, no-obligation quote with a layout, specification and full cost breakdown.
Welded H-section steel members on work stands in a fabrication hall with an overhead craneSteel Fabrication Facility: Six Factories and 12 Production Lines
Xinguangzheng’s steel fabrication facility spans six factories with 12 production lines on 150,000 m² (about 1.6 million sq ft) of factory space. Annual capacity is up to 150,000 tonnes of steel structures, and the company has 1,000+ employees. For the pre-engineered steel buildings we export, we manufacture the primary and secondary structure, roll-formed sheet in 11 profiles and lightweight wall panels. We supply doors, windows, cranes, insulation cores and skylights rather than manufacture them, so ask which lines of your quote fall on each side.

Quality Control
- What it covers
- Ultrasonic testing (UT) of main welds and coating thickness checks
- Evidence you can ask for
- UT report and photos

Certifications
- What it covers
- CWB · CSA W47.1 Div.1, CE / EN 1090, EAC · GOST 23118-2019 and ISO 9001:2015, held by Qingdao Xinguangzheng Steel Structure Co., Ltd.
- Evidence you can ask for
- Certificate copies on request
Metal building quality control means main-weld ultrasonic testing and coating thickness checks, with the UT report and photos sent before the final payment. Behind those checks sit steel fabrication certifications covering welding, European execution, Eurasian market access and quality management.
Welding robot and plate cutting table in a steel fabrication workcellA local contractor is the simpler route for projects under 3,000 m², or for buyers who need one company to take on foundation and erection under a turnkey price. For kit orders, the buyer designs and builds the foundation locally, using column base reaction data from Xinguangzheng. The buyer’s local contractor erects the steel, supported by the installation manual and free remote guidance.
Cutting, Beveling and Drilling
Laser plate cutting, profile cutting and marking, laser tube cutting, bevel milling and a large platform drill.
Welding and Bending
Welding robots and a large bending machine.
Roll Forming, Wall Panels and Coating
Roll forming in 11 sheet profiles, a lightweight wall panel line and an automatic spray line.
Steel Structure Fabrication Process: 3D Model Confirmation, Cutting, Welding, Coating, Inspection and Packing
Production for a steel structure fabrication order runs 15–40 days depending on tonnage, confirmed in your quote. The whole project usually takes 4–12 weeks, including consultation, 3D design confirmation, factory prefabrication and local installation.
Steel fabrication flow from 3D model to cutting, welding, coating, weld testing- 3D Modeling and ConfirmationTekla 3D modeling produces the shop drawings, and steel is cut only after the buyer confirms the 3D model.
- Cutting and DrillingPlates and sections are cut, beveled and drilled on laser, bevel-milling and platform-drill equipment.
- WeldingWelding robots join the steel, and the welding is covered by CWB · CSA W47.1 Div.1 from the Canadian Welding Bureau.
- Blasting and CoatingSteel is blasted to Sa2.5 and coated with epoxy zinc-rich primer on an automatic spray line, with hot-dip galvanizing as an option.
- Inspection Before Final PaymentMain welds are tested by ultrasonic testing (UT), and coating thickness is measured. Inspection ratios and tolerances are not published here, so ask for the inspection scope of your project when you request the quote. Payment is by T/T or L/C with a 30% deposit and 70% before shipment, and the UT report and photos reach you before that final payment, with third-party inspection welcome.
- Packing and ShipmentSteel is bundled on steel pallets with export packing and a container loading plan. Shipments leave Qingdao Port, about 1.5 hours from the factory, in 20′GP, 40′GP, 40′HQ or 40′OT containers or as bulk. Shop drawings, the installation manual and the UT report and photos go with the order, and sea transit time is confirmed in your quote by destination port.
Structural Steel Materials and Kit Scope: Q355B H-Sections, Galvanized Purlins and Roll-Formed Panels
Structural steel materials for the main frame default to Q355B welded H-sections, with Q235B or Q460 available, and the grade for your project is confirmed in your quote. The design code is set by the destination country and your project engineer, and a high wind or snow zone named in your inquiry brings heavier frames and closer purlin spacing. A single clear span is normally built up to 60 m with no interior columns, and spans up to 100 m are designed per project. These materials are quoted as one building kit, so the paragraphs below the table set out what the quote includes, what is optional and what stays outside it.
| Component | Material | Supply basis |
|---|---|---|
| Primary frame | Q355B welded H-section; Q235B or Q460 optional | Manufactured |
| Secondary structure | Galvanized Z and C purlins | Manufactured |
| Roof and wall | 0.5 mm profiled steel sheet; EPS, rock wool or PU sandwich panels optional | Sheet roll-formed, insulation core supplied |
The quote covers one export steel building kit, starting with the steel structure, roof and wall panels, and gutters and downspouts. Bolts and accessories are priced in the same quote. Shop drawings, the installation manual, export packing and a container loading plan are also included, so a competing offer is comparable only when it lists the same items.
Insulation, a crane runway system, facade design and on-site installation guidance are optional items added to the quote on request. Insulation is one of the choices that moves cost, so the options a project needs belong in the inquiry rather than after the quote. On-site installation guidance is an optional guidance service, while on-site installation itself stays outside the quote.
Foundation, on-site installation, site preparation and permits are excluded from the quote. The price is a China factory price, so sea freight, inland transport, insurance, customs clearance, duties and taxes are excluded as well. Anchor bolt supply is confirmed in your quote. Line these items up against the scope your local contractor and freight forwarder cover before you compare offers from different fabricators.
Steel Structure Surface Treatment: Sa2.5 Blasting, Zinc-Rich Primer and Optional Galvanizing
Steel structure surface treatment starts with Sa2.5 blasting and an epoxy zinc-rich primer, applied on an automatic spray line. Coating thickness is measured at the factory before the steel ships.
Blasted steel H-section beside a primer-coated steel H-sectionWhen your project specification calls for galvanizing, hot-dip galvanizing is quoted as an option and the choice is confirmed in your quote.
Coatings, loads and spans are engineered to the code that applies at your site. Structures are designed for a 50-year service life, with maintenance as set out in the maintenance manual.
Tell us the coating you need, standard epoxy zinc-rich primer or hot-dip galvanizing, with the site country and project tonnage, and we confirm the coating approach in your quote.
Email My Coating RequirementsFabrication FAQs: Certificates, Order Size, Cranes and Documents
Which certificates cover Xinguangzheng’s steel structure fabrication?
All products are controlled under an ISO 9001:2015 quality system, and welding is covered by CWB · CSA W47.1 Div.1. The company also holds CE / EN 1090, EAC · GOST 23118-2019, ISO 14001, ISO 45001 and China’s Grade I qualification for steel structure manufacturing. Certificate copies are available on request.
Which legal entity fabricates the steel and holds the certificates?
Qingdao Xinguangzheng Steel Structure Co., Ltd. is the legal entity that manufactures the steel structures and holds the certificates and qualifications. The company has been listed on China’s National Equities Exchange and Quotations (NEEQ: 834422) since 2015. That full company name is the holder to look for on any certificate copy you request.
What is the minimum order, and which building types does it cover?
Projects start at 3,000 m². From that size up, the kit is supplied for building types such as warehouses, industrial plants, workshops, hangars, cold storage and office buildings. Building area is the measure for that threshold, and the quote also needs the width, length and eave height of the building.
Can the frame be designed for an overhead crane?
Frames can be quoted with allowance for 5 t, 10 t or 20 t bridge cranes. The crane itself is an item Xinguangzheng supplies rather than manufactures. Crane tonnage is one of the inputs the quote needs and one of the factors that moves cost, so it belongs with your building dimensions.
What do I receive with the quote, and what happens before cutting starts?
The quote comes with a layout, a specification and an itemized price breakdown, free of charge. Before any steel is cut, the 3D model is sent to you for confirmation. That confirmation is the point to compare the model with your own drawings, since cutting only starts after you confirm it.
How tall can the frame be, what bay spacing is used, and can a mezzanine be added?
Eave height runs 6–12 m and can be raised. Bay spacing is 6–9 m and can be adjusted to a racking layout. The frame can be single-span with no interior columns or multi-span with interior columns, and a mezzanine can be added. Eave height and the single-span or multi-span choice are among the inputs the quote needs.
Can you provide mill certificates or a certificate of origin?
Documents that travel with the order are the shop drawings, the installation manual, and the UT report and photos. Mill certificates and certificates of origin are not published on this page, so send the document list your local authority requires with your inquiry and settle the question before ordering.
Guides
Industrial Steel Building Corrosion Protection, Zone by ZoneIndustrial steel building corrosion protection by zone and member group: ISO 12944 categories, coating systems, detailing and export delivery checks.
Metal Building Purlins and How Roof Loads Reach the FrameMetal building purlins explained: how Z or C section, lap continuity, roof panel restraint and bracing set span and spacing, and what to confirm.
Send Building Size, Site Country and Coating Needs for a Steel Fabrication Quote
Send the building type and use, width × length × eave height, site country or city, and whether the frame is single-span or multi-span. Crane tonnage, insulation needs, door and window counts, any mezzanine and a high wind or snow zone complete the brief, and we price your steel structure fabrication project against it. Cost moves with span, wind and snow load, crane tonnage and the code at your site, and with insulation, doors and windows and mezzanines.
Steel frame drawing, frame model on a tablet and a welded connection plate sample





