Exterior of a steel-frame office building with profiled roof and wall claddingPrefab metal office buildings
Prefab Metal Office Buildings
A metal office building from Xinguangzheng is one of our pre-engineered steel buildings, exported as a prefabricated steel kit designed per project: primary and secondary steel, roof and wall panels and accessories. The frame depends on clear span: single spans are standard to 60 m and engineered per project up to 100 m. We manufacture the primary and secondary steel, and your local contractor builds the foundation and erects the frame. Projects start at 3,000 m².
Start with the use of your office building, its width, length and eave height, the site country and whether a mezzanine is needed, and we answer with a free layout, specification and itemized quote.
Portal frame outline of an office building frame with span, length and eave height markedWidth, length and eave height for your own office building can be drafted in the building size planner.
- Listed on China's NEEQ since 2015 · 834422
- Founded in 1997
- ISO 9001 · 14001 · 45001
- 130+ countries and regions
Steel Frame Office Buildings: Frame Specifications
Steel frame office buildings from Xinguangzheng are engineered within the frame ranges in the table below, which belong to the parent building product and are not typical office sizes. A single clear span above 60 m moves the frame into project-specific engineering, so the building width is the first figure to check against the table. The quote returns a layout, specification and itemized cost for the use and dimensions in your request.
Portal frame of a steel office building| Item | Standard | Optional upgrade |
|---|---|---|
| Clear span | Single span up to 60 m | Up to 100 m by project-specific engineering |
| Eave height | 6–12 m | Higher on request |
| Bay spacing | 6–9 m | Not published for office layouts |
| Primary frame | Q355B welded H-section | Q235B or Q460 |
| Purlins | Galvanized Z or C purlins | Closer purlin spacing in high wind and snow zones |
| Roof and wall | 0.5 mm profiled steel sheet | EPS, rock wool or PU sandwich panel |
| Corrosion protection | Sa2.5 blast cleaning plus epoxy zinc-rich primer | Hot-dip galvanizing |
| Design loads | Engineered to the code that applies at your site | Heavier frame in high wind and snow zones |
| Crane provision | Quoted on request | Provision for a 5 t, 10 t or 20 t overhead crane |
| Mezzanine | Added to the layout when required | Mezzanine floor |
| Design life | 50-year design service life, with maintenance as set out in the maintenance manual | No optional upgrade published |
Modern Metal Office Building Layouts: Single Span, Multi-Span and Mezzanine
The frame form of a metal office building is settled by whether the floor plan can accept interior columns across its width. A width that must stay column-free calls for a single span, standard up to 60 m and engineered per project from there to 100 m. A plan that can accept column lines suits a multi-span frame, and the layout returned with the quote shows where each line falls. State single or multi-span, any single span above 60 m and any mezzanine in your first request, since office sizes and floor counts are not published on this page.
Cross-section of a single-span steel frame with no interior columnsSingle clear span
No interior column crosses the width, which suits open areas that columns must not interrupt.
Cross-section of a multi-span steel frame with interior column lines across the widthMulti-span
Interior column lines divide the width into several spans, so this form suits a plan that can accept those columns, and the quoted layout shows where each line falls.
Cross-section of a steel frame with a mezzanine floor inside the frameMezzanine
A mezzanine floor can be added to the frame as an option and is not a third frame type, so the request needs to say whether one is wanted.
Section comparison of a profiled steel sheetEnvelope and options to state in your request
- Roof and wall panels
- 0.5 mm profiled steel sheet, or EPS, rock wool or PU sandwich panelSandwich panel is the option, so the roof and wall insulation requirement goes into the request
- Insulation and facade design
- OptionalBoth are options added to the quote on request; thermal and acoustic values are not published on this page
- Doors and windows
- Count stated in your requestDoors and windows are supplied as bought-in items, and their number is one of the cost drivers
Metal Office Building Cost: What Moves the Quote
The quote for a metal office building moves with the cost drivers in the table below, so this page lists them and publishes no rate. A project under 3,000 m², or one that needs the supplier to build the foundation and erect the frame under a turnkey contract, is simpler to place with a local contractor. Insulation, a crane track system, facade design and on-site erection guidance are options added on request, and anchor bolt supply is confirmed in your quote.
| Cost driver | What moves the number |
|---|---|
| Clear span | A single clear span up to 60 m is standard, and a larger single clear span, up to 100 m, is engineered per project |
| Wind and snow loads | High wind and snow zones call for a heavier frame and closer purlin spacing |
| Local code | Loads, spans and coatings are engineered to the code that applies at your site |
| Insulation scheme | Roof and wall options run from 0.5 mm profiled sheet to EPS, rock wool or PU sandwich panel; a cold storage building costs more than a standard warehouse because of insulated panels and refrigeration, and is quoted per project |
| Door and window count | The number of doors and windows stated in your request is priced into the quote |
| Mezzanine | A mezzanine floor adds to the scope of supply |
Included in the quote
- Primary and secondary steel
- Roof and wall panels
- Gutters and downspouts
- Bolts and accessories, with anchor bolt supply confirmed in your quote
- Shop drawings and installation manual
- Export packing and loading plan
Not included
- Foundation and site preparation
- Site erection
- Ocean freight, insurance and inland transport
- Destination clearance, duties, taxes and permits
Steel Office Building Design Codes and Loads
A steel office building from Xinguangzheng is designed to the code set by the destination country and the project engineer, so the design basis changes with the site. The four codes below are design codes in common use, not certificates. The site country and city therefore come first in the request.
- AISC 360
- EN 1993
- AS 4100
- GB 50017
Design loads follow the code that applies at your site, and for Australia and New Zealand that loading code is AS/NZS 1170. High wind and snow zones get a heavier frame and closer purlin spacing. The final design of structure, services and civil works is confirmed by the local professionals for your project.
Four-step flow from destination code and loads to 3D model approval and shop drawingsDocuments you receive
- Layout, specification and itemized quoteReturned free with the quotation.
- 3D modelThe Tekla 3D model goes to the buyer for approval and steel is cut only after that approval, so column lines and openings are checked at this step.
- Shop drawingsProduced from the 3D model and supplied with the shipment.
- Installation manual and weld test reportThe installation manual is for the local erector, and the UT report and photos cover the main welds.
Steel Office Building Manufacturing and Quality Control
Steel office building frames from Xinguangzheng are manufactured by Qingdao Xinguangzheng Steel Structure Co., Ltd. (NEEQ: 834422), which is certified by the Canadian Welding Bureau to CSA W47.1 Division 1. It holds EN 1090 (CE), EAC (GOST 23118-2019), ISO 9001:2015, ISO 14001 and ISO 45001 certification, and China’s Grade I qualifications for steel structure manufacturing and steel structure engineering contracting. Certificate copies are available on request. Xinguangzheng has supplied an office building in the Solomon Islands and an office building attached to a workshop in Algeria, with area and year not published for either of these projects.
Cutting and welding
We manufacture the primary frame from Q355B welded H-section, with plate cut on laser cutting machines and welded by welding robots. Xinguangzheng runs six factories with 12 production lines and 150,000 m² (about 1.6 million sq ft) of factory space, for an annual capacity of up to 150,000 tonnes of steel structures.
Weld testing
Under the ISO 9001 quality system, main welds are tested by ultrasonic testing (UT) and coating thickness is measured; testing ratios are not published on this page.
Blast and prime
Steel is blast cleaned to Sa2.5 and coated with epoxy zinc-rich primer on an automated coating line, and hot-dip galvanizing is the option to request.
Check before final payment
The UT weld report and photos reach the buyer before the balance is paid, and third-party inspection is welcome.
Manufacturing process
Laser cutting of steel plate at a steel fabrication station
Welding robot joining a welded H-section steel member
Ultrasonic testing of a main weld on a structural steel memberHow an Office Building Order Moves from Brief to Shipment
An office building order runs in four steps, and each one hands the buyer something to check: quote and layout, 3D model, UT report and photos, then the loading plan. Payment is by T/T or L/C, with a 30% deposit and 70% paid before shipment. The UT report and photos for the main welds arrive before that 70% is paid, and third-party inspection is welcome. A buyer who wants a third-party inspection at the factory should arrange it before the steel is loaded.
Brief and quote
The brief covers building use, width, length and eave height, site country and city, and single or multi-span, plus insulation, door and window count and any mezzanine. A free layout, specification and itemized quote comes back, with the included and excluded items set out.
Model approval
The Tekla 3D model is sent to the buyer for approval, and steel is cut only after that approval, so layout changes belong at this step.
Fabrication, testing and payment
Production takes 15–40 days depending on tonnage, confirmed in your quote. Main welds are tested by UT and coating thickness is measured before the steel leaves the factory. The UT report and photos are sent before the 70% balance, which is paid before shipment, so the buyer can review them before paying.
Packing, shipment and site
Steel is packed on steel pallets with export packing and a loading plan, and ships from Qingdao Port, about 1.5 hours from the factory. Sea transit time is confirmed for your destination port in the quote, and a whole project usually runs 4–12 weeks. The foundation and erection are done by your local contractor, supported by column base reaction data, an installation manual and free remote guidance, with on-site erection guidance as an option.
Metal Office Building FAQ
What is a metal office building, and who is this kit supply not for?
An office building is one use of the same prefabricated steel building product that also serves warehouses, workshops and commercial buildings. Xinguangzheng manufactures the primary frame, secondary structure, profiled sheet and lightweight wall panels, and supplies doors, windows and insulation core material. Buyers wanting one turnkey contract that includes foundation and erection are outside this supply.
Can a steel frame office building have more than one floor?
A mezzanine floor can be added to the steel frame, and that is the only upper level stated on this page. Floor counts, mezzanine area and floor loading are not published here. Give the building use and say whether a mezzanine is needed, and the quote returns a layout and specification for that brief.
What project size does an office building quote start at?
Projects start at 3,000 m², so a small office shed below that size is not a fit for this supply. The usual buyer is an owner’s or developer’s project lead, or a local general contractor or steel erector, buying direct or through that contractor.
Why is there no price per square meter for an office building on this page?
Xinguangzheng publishes cost drivers, not rates, on its building type pages and quotes each office building per project. Quotes are China factory prices and exclude sea freight, insurance, inland transport, customs clearance, duties and taxes, which need a separate budget. The free quote itemizes the cost for your own dimensions and site.
How long does an office building take to produce and ship?
Production takes 15–40 days depending on tonnage, and the figure for your order is confirmed in the quote. From consultation through 3D design approval and prefabrication to local erection, a project usually runs 4–12 weeks. Sea transit days are not published and are confirmed for your destination port in the quote.
Who builds the foundation and erects the office frame?
Your local contractor does both, because foundation work and site erection sit outside the quote. The foundation is designed locally from the column base reaction data that Xinguangzheng provides. Erection is supported by an installation manual and free remote guidance, and on-site erection guidance can be added as an option.
Which design code will my office frame follow?
The destination country and the project engineer decide the code, so the answer depends on the site. AISC 360, EN 1993, AS 4100 and GB 50017 are in common use, with AS/NZS 1170 for loading in Australia and New Zealand. Name the site country and city in the request, since the location fixes the design basis.
How long is a steel office frame designed to last?
The frame is designed for a 50-year service life, with maintenance as set out in the maintenance manual. Standard corrosion protection is Sa2.5 blast cleaning plus epoxy zinc-rich primer, and hot-dip galvanizing is available as an option. The 50-year figure is a design basis and assumes that maintenance is carried out.
How is a steel office building packed for export?
Steel members are packed on steel pallets with export packing, and a loading plan is part of the quoted scope. Shipment is in 20′GP, 40′GP, 40′HQ or 40′OT containers or as bulk cargo, loaded at Qingdao Port. Sea freight is outside the quote and is budgeted separately.
Building Systems, Design, Construction and Manufacturing
Guides
Steel Frame Office Building Cost: What the Kit Price CoversSteel frame office building cost explained: what the export kit quote covers, which floor, span and load inputs set steel, and how to compare…
Metal Building Office Floor Plans That Fit the Steel FrameMetal building office floor plans that fit the frame: fix zones, the stair and restroom core and any mezzanine, then check walls against the…
Office building quote
Get a Metal Office Building Quote
To compare metal office building offers on the same scope, start with the six details below, and we reply with a free, no-obligation quote with a layout, specification and full cost breakdown. Drawings and site information can be attached to the brief sent to [email protected].
- 1Building use — the building type and what the office building will be used for
- 2Dimensions — width, length and eave height; span is one of the cost drivers
- 3Site location — country and city, and whether the site is in a high wind or snow zone
- 4Single or multi-span — whether the plan can accept interior column lines
- 5Insulation, doors and windows — roof and wall insulation requirement, and the door and window count
- 6Mezzanine and crane — whether a mezzanine is needed, and the crane tonnage if a crane is part of the brief