Metal Building Glossary: Terms in a Xinguangzheng Steel Building Quote
Our metal building glossary lists the terms in a Xinguangzheng steel building kit quote: structure, panels and accessories from the factory, foundation and erection by your local team. The quote depends on nine inputs you provide, including building type, width × length × eave height and site country. We manufacture the primary and secondary structure and the roof and wall panels named in these terms.
Building type, width × length × eave height and destination country open a quote request, and the remaining inputs are listed further down this page. From the full set we prepare a free, no-obligation quote with a layout, specification and full cost breakdown.
Cutaway view of a single-span steel buildingMetal Building Terminology for Size, Framing and Envelope
Metal building terminology in a Xinguangzheng quote falls into size, framing and envelope terms for a building designed per project. The same terms apply to warehouses, industrial plants, workshops, hangars, cold storage, offices, car showrooms, commercial buildings and high-bay warehouses. Each row gives the value Xinguangzheng quotes and the item you confirm, and a meaning appears only where the product specification states one.
| Term | In a Xinguangzheng quote | What you confirm |
|---|---|---|
| Clear span | Single span with no interior columns; normally up to 60 m, with wider spans up to 100 m designed per project | The quoted span, and whether it is designed per project |
| Single-span | Structural form with no interior columns | The form for a floor that must stay column-free; single or multi-span is a quote input |
| Multi-span | Structural form with interior columns | An option where the layout accepts interior columns; confirmed per project in the quote |
| Eave height | 6–12 m, and can be raised | A quote input, sent with width and length; checked on the 3D model before cutting |
| Column spacing | 6–9 m, adjustable to the racking layout | Your racking layout, sent with the inquiry; the spacing as shown on the 3D model |
| Primary frame | Welded H-section steel in Q355B; Q235B or Q460 optional | The steel grade named in the quote |
| Secondary framing | Galvanized Z or C purlins | The purlin section named in the quote |
| Roof and wall panels | 0.5 mm profiled steel sheet | The sheet thickness named in the quote |
| Sandwich panel | Optional panel with an EPS, rock wool or PU core | Roof and wall insulation needs, a quote input stated in the inquiry |
| Surface preparation and primer | Surface preparation is Sa2.5 blasting; the primer is epoxy zinc-rich; hot-dip galvanizing is optional | Whether the quote lists the primer system or hot-dip galvanizing |
| Bridge crane allowance | The quote can allow for a 5 t, 10 t or 20 t bridge crane | Crane tonnage, a quote input; whether the optional crane rail system is listed |
| Mezzanine | A mezzanine floor can be added | The mezzanine requirement, a quote input stated in the inquiry |
This page gives no measuring points for clear span, eave height or column spacing; check all three dimensions on the 3D model, which goes to you for confirmation before cutting starts.
Scope and Price Terms in This Metal Building Glossary
Scope and price terms in a Xinguangzheng quote rest on nine inputs that you provide for each project. They are building type and use, width × length × eave height, site country or city, single or multi-span, crane tonnage, roof and wall insulation, door and window count, mezzanine, and high wind or snow zone. Six cards sort the scope terms of this metal building glossary into included, optional and not-included items.
Included: structure and envelope
Steel structure, roof and wall panels, gutters and downspouts, bolts and accessories are included in the quote. These five are the lines to match against the quote list.
Included: documents and packing
Shop drawings, the installation manual, export packing and the packing plan are included, and the kit is packed on steel pallets. The packing plan is a line to check in the quote, and the drawings and manual arrive with the shipment.
Optional
Insulation, a crane rail system, facade design and on-site installation guidance are optional items. Any of the four you need belongs in the inquiry, and the quote shows whether it is listed.
Not included: site work
Foundation, on-site installation, site preparation and permits are not included in the quote. These four stay with you and your local team.
Not included: freight and import
Ocean freight, customs clearance, duties, taxes, insurance and inland transport are not included in the quote. These six are arranged separately on your side and belong in your own budget.
Anchor bolts
Anchor bolt supply is confirmed in your quote.
Factory price in a Xinguangzheng quote means a China factory price that excludes ocean freight, with Qingdao as the shipping port about 1.5 hours from the factory. Loading is by 20′GP, 40′GP, 40′HQ or 40′OT container or as bulk cargo, and ocean transit time is confirmed in the quote for your destination port. The price moves with span, wind and snow load, crane tonnage and local code, and also with the insulation scheme, door and window count and mezzanine. State those seven conditions in every inquiry, so the quotes you compare describe the same building.
Minimum order means projects start at 3,000 m². Payment terms are T/T or L/C, with a 30% deposit and the 70% balance paid before shipment. Lead time means production time of 15–40 days, which follows tonnage and is confirmed in the quote.
Kit supply under these terms covers a building made at the factory and erected by your local team. Projects under 3,000 m², or projects that need the supplier to carry the foundation and installation under a turnkey lump-sum contract, fall outside this kit supply, and a local contractor is the simpler route.
Nine inputs, from building type and use to high wind or snow zone, turn the terms above into a project description. Send them and we return a layout, specification and itemized quote, free of charge.
Send My Nine InputsDesign, Inspection and Handover Terms in a Steel Building Quote
Design, inspection and handover terms in a Xinguangzheng quote describe how the building is engineered, checked at the factory and passed to your local team. The design code among them depends on the destination country and the project engineer. Six steps follow as a suggested order for your own checks, from inquiry to arrival; the order is a reading aid and does not describe a Xinguangzheng production or approval sequence.
Designed to
The destination country and the project engineer set the design code, with AISC 360, EN 1993, AS 4100, AS/NZS 1170 and GB 50017 as common choices. The phrase states the design basis, so your part is to name the code your local engineer requires and to check the code written in the quote.
Design loads
Loads, spans and coatings are engineered to the code that applies at your site. In high wind or snow zones the frames are heavier and the purlins closer together, which is why the zone is a quote input stated in the inquiry.
3D model and shop drawings
Shop drawings come from a Tekla 3D model. Before cutting starts we send the model to you, and cutting begins only after you confirm it. Clear span, eave height and column spacing are the dimensions to check on the model at this step.
Column base reaction data
The foundation is designed and built locally on your side, and we provide the column base reaction data. Pass the data to whoever designs your foundation locally.
UT report
UT is ultrasonic testing of the main welds, and factory inspection also measures coating thickness. The UT weld report and photos reach you before the balance payment, and third-party inspection is welcome. The report and photos are the items to review before that payment.
Shipped documents
Shipped documents are the shop drawings, the installation manual, and the UT report and photos. These document sets are the list to count against when the shipment arrives.
On-site installation is outside the quote; an installation manual and free remote guidance are provided, and on-site installation guidance is an optional item. All products are managed under an ISO 9001:2015 quality system. Design service life belongs to the building, which is designed for a 50-year service life, with maintenance as set out in the maintenance manual.
Questions About Reading a Steel Building Quote
What does this metal building glossary cover, and what does it leave out?
The metal building glossary covers terms that appear in a Xinguangzheng steel building kit quote, with the value quoted and the item you confirm for each. General A–Z industry entries and other suppliers’ naming are left out. Clear span and eave height carry quoted values here, and you check their measuring points on the 3D model.
How do I choose between single-span and multi-span?
Compare your building width with the 60 m that a clear span normally reaches. At or under that width, a single-span frame leaves the floor free of interior columns. Above it, the options are a wider single span designed per project, up to 100 m, or a multi-span frame with interior columns.
Are metal building, pre-engineered steel building and custom metal building kit different products?
Metal Building, Pre-Engineered Steel Buildings and Custom Metal Building Kits are three names for one Xinguangzheng product. Each name refers to a building designed per project, prefabricated at the factory and exported as a steel building kit. The comparison between offers sits in the included, optional and not-included lists of each quote, whatever the product name.
Is AS/NZS 1170 a certification?
AS/NZS 1170 is the Australian and New Zealand code for structural design actions and loads, and no certificate exists for it. A quote can state that the structure is designed to AS/NZS 1170 where the destination country and project engineer call for it. The code name written in the quote is the item to check.
What is the difference between production lead time and project duration?
Production lead time is 15–40 days, set by tonnage and confirmed in the quote. Project duration normally runs 4–12 weeks and spans consultation, 3D design confirmation, factory prefabrication and local installation. Ocean transit time is confirmed in the quote for your destination port.
Which items does Xinguangzheng manufacture, and which does it supply?
Xinguangzheng manufactures the primary and secondary structure, the profiled sheets and the wall panels. Doors and windows, cranes, insulation cores and skylights are supplied items. Annual capacity is up to 150,000 tonnes of steel structures. That split is the reference for each quote line when the kit is compared with another supplier’s offer.
Send Building Type, Size and Destination for a Quote
The quote inputs named on this page are the lines you fill in: building type, width × length × eave height, destination country and the rest of the nine. Send them on WhatsApp, and we return the layout, specification and full cost breakdown for your project.
Plan and elevation drawings of a single-span steel building