Pre-engineered steel buildings · Qingdao, China · Since 1997
Exterior of a steel frame workshop building with clad roof and wallsExterior of a steel frame workshop building with clad roof and walls

Prefab steel workshops

Prefab Steel Structure Workshop Buildings

A steel structure workshop from Xinguangzheng is a project-designed prefabricated steel structure, supplied as a factory-made steel kit for export: primary and secondary steel, roof and wall panels and accessories. Column-free width depends on your project: a single span is standard to 60 m, and up to 100 m is designed project by project. We manufacture the primary and secondary steel and the profiled sheet, while foundation and site erection are done locally by the buyer. Projects start at 3,000 m².

Once the workshop’s width, length and eave height, the site country and any crane tonnage are on one page, we turn them into a layout, specification and itemized quote, free of charge.

Size your workshop frame
Steel workshop portal frame with arrows marking span between columns and eave heightSteel workshop portal frame

Width, length and eave height for your own workshop can be drafted in the building size planner.

  • Listed on China's NEEQ since 2015 · 834422
  • Founded in 1997
  • ISO 9001 · 14001 · 45001
  • 130+ countries and regions

Specifications

Steel Structure Workshop Specifications

A steel structure workshop is built within the frame ranges in the table below, which are the parent-product ranges shared with industrial pre-engineered metal buildings and metal aircraft hangars. None of these rows is a workshop-specific specification: the eave height and crane tonnage your workshop needs are details you send with your request for the quote.

Cutaway of a steel workshop frame with numbered positions for span, eave height, purlins, roof and wall panels and craneCutaway of a steel workshop frame
Numbers on the frame match the rows in the table.
ItemStandardOptional
Clear spanSingle span up to 60 mUp to 100 m by project-specific design
Eave height6–12 mCan be raised
Bay spacing6–9 mAdjustable to a rack layout
Primary frameQ355B welded H-sectionQ235B or Q460
PurlinsGalvanized Z or C purlinsCloser purlin spacing in high wind and snow zones
Roof and wall0.5 mm profiled steel sheetEPS, rock wool or PU sandwich panel
Corrosion protectionSa2.5 blast cleaning plus epoxy zinc-rich primerHot-dip galvanizing
Design loadsEngineered to the code that applies at your siteHeavier frame in high wind and snow zones
CraneProvision added to the quote when requiredQuote provision for a 5 t, 10 t or 20 t overhead crane
MezzanineAdded when requiredMezzanine floor
Design lifeDesigned for a 50-year service lifeWith maintenance as set out in the maintenance manual

Frame options

Steel Frame Structure Workshop: Single Span, Multi-Span and Crane Provision

A steel frame structure workshop takes its frame form from one question: whether the production floor can accept interior columns. A floor that must stay column-free takes a single span, standard up to 60 m and up to 100 m by project-specific design; a floor that accepts interior column lines can take multi-span instead. Crane tonnage is a separate constraint: the quote can allow for a 5 t, 10 t or 20 t overhead crane, and that tonnage is both a quote input and a cost driver. No size chart by process or industry is published here, so span, eave height and crane tonnage come from your own process when you request the quote.

Interior of a single-span steel frame building with no interior columns across the widthInterior of a single-span steel frame building with no interior columns across the width

Single clear span

No interior columns cross the width of the frame. Choose this form when the floor must stay free of columns: up to 60 m is standard, and a wider clear span, to 100 m, is designed for the project. The clear width you need goes into the request with the other dimensions.

Up to 60 m standard, up to 100 m by project design
Interior of a multi-span steel frame building with interior column lines dividing the widthInterior of a multi-span steel frame building with interior column lines dividing the width

Multi-span

Interior column lines divide the width into several spans. This form fits only a floor that can accept those column lines, and single or multi-span is one of the inputs for the quote.

Interior column lines
Steel workshop frame showing a crane beam beside the columnSteel workshop frame showing a crane beam

Overhead crane provision

The quote can allow for a 5 t, 10 t or 20 t overhead crane, and the crane rail system is an optional item. A workshop that will run an overhead crane needs the tonnage stated in the request, because crane tonnage is a quote input.

Metal fabrication shop design turns a cutting, forming and welding route into door openings, column positions, crane coverage, floor loads and roof openings. An equipment service workshop has to keep new parts, parts awaiting repair and oily stripped components in separate zones, a rule that shapes industrial equipment maintenance workshop building design.

Bay count in a mining equipment maintenance workshop building follows the peak number of machines down at the same time, not the size of the fleet. Shore-side repair adds a separation between oily or salt-laden parts and clean reassembly to marine repair workshop steel building design.

5 t, 10 t or 20 t provision; rail system optional
Steel column base detail showing column base reaction data from the supplier and the foundation by the local contractorSteel column base detail showing column base reaction data from the supplier

Interfaces to settle before quoting

Mezzanine
Can be addedNamed in the request for the quote
Foundation
By your local contractorDesigned and built locally; column base reaction data is provided for that design
Crane rail system
OptionalListed in the quote as an optional item

Cost drivers

What Drives the Cost of a Steel Workshop Building

Steel workshop building cost moves with clear span, wind and snow loads, the local design code and crane tonnage, then with insulation, door and window count and a mezzanine. Quotes are China factory prices and exclude sea freight, and no rate or price range is published on this page. For a building under 3,000 m², or a turnkey contract where one supplier also builds the foundation and erects the steel, a local contractor is the simpler route. Insulation, a crane rail system, facade design and on-site erection guidance are optional items, and anchor bolt supply is confirmed in your quote.

Cost driverWhat it changes in the quote
Clear spanA single span is standard up to 60 m; a wider clear span, up to 100 m, is designed per project
Wind and snow loads with local codeHigh wind and snow zones call for a heavier frame and closer purlin spacing, under the code set by the destination country and the project engineer
Crane tonnageThe quote can allow for a 5 t, 10 t or 20 t overhead crane, with the rail system as an optional item
Insulation0.5 mm profiled steel sheet is the baseline; EPS, rock wool or PU sandwich panels are optional
Doors and windowsThe number of doors and windows is a quote input
MezzanineA mezzanine floor can be added and is named in the request

Included in the quote

  • Primary and secondary steel
  • Roof and wall panels
  • Gutters and downspouts
  • Bolts and accessories
  • Shop drawings and installation manual
  • Export packing and container loading plan

Not included

  • Foundation and site preparation
  • On-site erection
  • Sea freight, insurance and inland transport
  • Customs clearance, duties, taxes and permits

Engineering

Workshop Frame Design Codes and Loads

The design code for a workshop frame is set by the destination country and the project engineer. The frame is designed to that code, and the four listed below are design codes in common use, with no certificate attached to any of them.

  • AISC 360
  • EN 1993
  • AS 4100
  • GB 50017

Loads are engineered to the code that applies at your site, and AS/NZS 1170 sets the design actions for projects in Australia and New Zealand. High wind and snow zones get a heavier frame and closer purlin spacing, so state that exposure with the site country and city. The final design of structure, building services and civil works is confirmed by the local professionals for your project.

Flow of four steps from destination code and loads to 3D model approval and shop drawingsFlow of four steps from destination code and loads to 3D model approval and shop drawings

Documents you receive

  • Layout, specification and itemized quoteSupplied free of charge.
  • 3D model approval before cuttingThe Tekla 3D model is sent to you, and no steel is cut until you approve it.
  • Shop drawings and installation manualPart of the documents shipped with the steel.
  • UT report and photosThe ultrasonic weld testing report and photos arrive before the balance is paid.

Quality

Steel Workshop Manufacturing and Quality Control

We manufacture workshop primary and secondary steel and profiled sheet under an ISO 9001 quality system, on 12 production lines with an annual capacity of up to 150,000 tonnes of steel structures. Our steel structures are manufactured by Qingdao Xinguangzheng Steel Structure Co., Ltd. (NEEQ: 834422), which is certified by the Canadian Welding Bureau to CSA W47.1 Division 1. The company holds EN 1090 (CE), EAC (GOST 23118-2019), ISO 9001:2015, ISO 14001 and ISO 45001 certification, and certificate copies are available on request. Xinguangzheng has supplied a car dealership showroom and workshop in Uruguay, and a logistics workshop and a television-set workshop in Algeria, all of them entries in the workshop project list of supplied kits.

1997Year founded
12Steel structure production lines
150,000tAnnual capacity, up to
1,000+Employees
130+Countries and regions exported to
5,000+Projects delivered
150,000 m²Total factory area
834422NEEQ stock code, listed 2015
  1. Cutting and welding

    Laser plate cutting and welding robots turn plate into Q355B welded H-section main frames.

  2. Weld testing

    Main welds go through ultrasonic testing (UT), and coating thickness is measured as part of the factory inspection.

  3. Blast and prime

    Steel is blast cleaned to Sa2.5 and coated with epoxy zinc-rich primer on an automated coating line, with hot-dip galvanizing as an option.

  4. Check before final payment

    The UT report and photos reach you before the balance is due, and third-party inspection is welcome.

Manufacturing process

Laser cutting of steel plate at a steel fabrication stationLaser cutting of steel plate at a steel fabrication station

Process

From Workshop Brief to Shipment

A steel structure workshop order is paid by T/T or L/C: a 30% deposit, then the remaining 70% before shipment. Before that balance is paid, the UT weld report and photos are sent to you, so payment and inspection evidence stay tied together. A whole project usually runs 4–12 weeks, and the factory production days inside that time are listed in step 3.

  1. Requirements

    The brief covers building use, width, length and eave height, site country and city, and single or multi-span. Crane tonnage, insulation, door and window count, a mezzanine and any high wind or snow exposure complete it.

  2. Quotation

    A layout, a specification and an itemized quote come back free of charge. The cost section above lists what the quote includes and what it leaves out.

  3. Design and fabrication

    The Tekla 3D model goes to you for approval, and steel is cut only after you approve it. Production takes 15–40 days depending on tonnage, confirmed in your quote.

  4. Shipment and erection support

    Steel is packed on steel pallets with export packing and a loading plan, and ships from Qingdao Port. Sea transit time is confirmed for your destination port in the quote. Site erection is outside the quote: an installation manual ships with the steel, remote guidance is free, and on-site guidance is an optional item.

FAQ

Steel Structure Workshop FAQ

Is a steel structure workshop kit a fit for a project under 3,000 m²?

Projects start at 3,000 m², so a small shed or garage below that area is outside this supply. An individual comparing locally installed turnkey prices in the United States is not comparing like with like either: the quote here is a China factory price for the kit alone.

Do I need to fix the crane tonnage before asking for a workshop quote?

Crane tonnage is one of the listed quote inputs and one of the cost drivers, so it belongs in the first request. Provision is quoted for a 5 t, 10 t or 20 t overhead crane, with the rail system optional. Adding a crane later is not covered on this page, so name a future crane now.

Can workshop dimensions be sent in feet?

Feet are accepted: width, length and eave height can be given in meters or feet. Drawings and site information can be attached to the same request. Dimensions on this page are metric, so state the unit beside each figure to keep the layout and quote on the right scale.

Which insulated roof and wall build-ups can a workshop take?

Single 0.5 mm profiled steel sheet is the baseline roof and wall. The insulated options are glass wool with aluminum foil, a 50 mm EPS sandwich panel, and a 75 mm rock wool or PU sandwich panel. Insulation is an optional item and a cost driver, and thermal values are not published on this page.

Are the doors, windows and skylights of a workshop made by Xinguangzheng?

Doors, windows, insulation core material and skylights are items Xinguangzheng supplies rather than manufactures. In-house manufacture covers the primary frames, secondary structure, profiled sheet in 11 profiles and lightweight wall panels. Door and window count is a quote input, so list it with the workshop dimensions.

Which container types carry a steel workshop kit?

Shipment is in 20′GP, 40′GP, 40′HQ or 40′OT containers, or as bulk cargo. Loading is at Qingdao Port, about 1.5 hours from the factory. Sea freight and insurance sit outside the quote, so your forwarder needs the loading plan that comes with the export packing.

Which stages does the 4–12 week project time cover?

Consultation, 3D design approval, factory prefabrication and local erection are the stages counted in the usual 4–12 weeks. Factory production is the 15–40 day part, set by tonnage and confirmed in your quote. Sea transit days are not published and are confirmed for your destination port.

Has Xinguangzheng supplied a workshop combined with a showroom or an office?

Two listed projects pair a workshop with another use: a car dealership showroom and workshop in Uruguay, and a television-set workshop with an office building in Algeria. Offices and car showrooms belong to the same prefabricated steel building range. For a mixed project, name every use in your request.

Can the workshop frame be hot-dip galvanized instead of painted?

Hot-dip galvanizing is the optional finish; the standard one is Sa2.5 blast cleaning plus epoxy zinc-rich primer. Coatings, like loads and spans, are engineered to the code that applies at your site. Ask for galvanizing in the request; coating thickness figures are not published on this page.

Systems, Design, Construction and Manufacturing for Your Workshop

Workshop quote

Get a Steel Workshop Quote

A steel structure workshop inquiry can start while single or multi-span and crane tonnage are still open. We prepare a free, no-obligation quote with a layout, specification and full cost breakdown, and that quote needs the six details listed below. Projects start at 3,000 m².

  1. 1Building type and use — What the workshop will be used for
  2. 2Width × length × eave height — In m or ft
  3. 3Site location — Country and city, and whether the site is a high wind or snow area
  4. 4Single or multi-span — Whether the floor can accept interior columns
  5. 5Crane — None, or 5 t, 10 t or 20 t
  6. 6Insulation, doors, windows, mezzanine — Roof and wall insulation, door and window count, and any mezzanine

Get a Free Quote for Your Steel Building

No Choosen File
(Max 2 MB)

Prefer email or WhatsApp? Email us · WhatsApp

Free quote

Get a Steel Building Quote

Send width × length × eave height and the site country. We return a free, no-obligation quote with a layout, a specification and a full cost breakdown, for projects from 3,000 m².

Prefer direct contact? WhatsApp · [email protected]

English (US)

WhatsApp or call

Chat with a steel building engineer

Send span, length, eave height and the site country. An engineer replies within 24 hours, Monday to Saturday (GMT+8).

Scan with your phone
WhatsApp / phone +86 183 6628 8508
Open WhatsApp chat

Prefer a written quote? Request a quote online · Email us

Email

Email your project details

Write to our engineering team. Drawings and site photos are welcome, but size and location are enough to start.

Helpful to include

Prefer a form? Request a quote online · WhatsApp