Exterior of a steel warehouse buildingPrefab steel warehouse
Prefab Steel Warehouse Building Kits, Engineered to Your Site
Within our range of pre-engineered metal buildings, we supply prefab steel warehouse building kits: primary and secondary steel and roof and wall panels, which we manufacture, plus accessories. Each steel warehouse building is supplied for local foundation and erection, and the frame depends on your clear span, design loads and site. Projects start at 3,000 m².
Send your warehouse dimensions, site location and intended use, and we return a free layout and specification for projects from 3,000 m².
Steel warehouse portal framesWidth, length and eave height for your own warehouse can be drafted in the building size planner.
- Listed on China's NEEQ since 2015 · 834422
- Founded in 1997
- ISO 9001 · 14001 · 45001
- 130+ countries and regions
Steel Warehouse Building Specifications: Span, Eave Height and Bay Spacing
Xinguangzheng supplies each steel warehouse building as a kit for projects from 3,000 m², and the table below gives the standard supply and the options for every component. Projects below 3,000 m² and turnkey projects that need the supplier to build the foundation and erect the building are not a fit; a locally contracted building is simpler for them. Whether the building is for general storage or for electronics warehouse building construction, a quote starts from three inputs: dimensions, site location and intended use. Showrooms and retail buildings that receive customers start from the specifications for steel frame commercial buildings instead.
Cutaway of a steel warehouse frame| Item | Standard | Optional |
|---|---|---|
| Clear span | Single span up to 60 m | Up to 100 m by project-specific engineering |
| Eave height | 6–12 m | Higher on request |
| Bay spacing | 6–9 m | Adjusted to your racking layout |
| Primary frame | Q355B welded H-section | Q235B or Q460 |
| Purlins | Galvanized Z or C purlins | Closer purlin spacing in high wind and snow zones |
| Roof and wall | 0.5 mm profiled steel sheet | EPS, rock wool or PU sandwich panel |
| Corrosion protection | Sa2.5 blast cleaning plus epoxy zinc-rich primer | Hot-dip galvanizing |
| Design loads | Engineered to the code that applies at your site | Heavier frame in high wind and snow zones |
| Crane | Provision added to the quote when required | Provision for a 5 t, 10 t or 20 t overhead crane in the quote |
| Structure | Single span, no interior columns | Multi-span, with interior columns |
PEMB Warehouse Configurations: Single Span, Multi-Span and Crane Provision
A steel frame warehouse building is framed in Q355B welded H-section and laid out as a single span or a multi-span hall. Choose a single span when racking lanes and forklift routes must stay free of interior columns, and a multi-span layout when interior column lines can work with your racking plan. Clear span and crane tonnage are both price drivers, so they belong in the request with the dimensions. Production halls built as steel frame industrial buildings can add crane provision as an option, and a hangar for aircraft takes a single span up to 60 m as standard.
Interior of a single-span steel warehouse with no columns across the widthSingle clear span
No interior columns cross the width, so racking lanes and forklift routes run the full width of the hall. Common uses include a steel logistics distribution center building and a fertilizer storage warehouse building.
Bulk storage changes what the walls carry, so bulk grain warehouse wall loads have to be briefed for grain, with the floor, roof openings and equipment supports, before the steel frame is designed. The brief for cotton warehouse construction starts with the cargo: bale type and weight, stacking and handling method, lot and shipping rules, and the fire engineer’s and insurer’s requirements.
Leaf bales and packed cartons do not present the same design inputs, so the stored stock form is the first of the tobacco storage warehouse building requirements. Timber length matters as well, since a processed timber storage warehouse design for short pallets of planed boards needs different grids, doors and floors from one for long structural bundles.
Interior of a multi-span steel warehouse with rows of interior columns dividing the widthMulti-span
Interior column lines divide the width into several spans, and the layout you receive with the quote shows where they fall.
Interior of a steel warehouse with an overhead crane on runway beams and a mezzanine floorCrane and mezzanine provision
The quote can provide for a 5 t, 10 t or 20 t overhead crane, and a mezzanine floor can be added.
Plan view of a steel warehouse with the column grid and rows of rackingColumn grid and racking layout
- Racking plan
- Sent with the inquiryBay spacing can be adjusted to the racking layout
- Interior columns
- Accepted in the aisles, or notThe answer decides between single span and multi-span
- Column positions
- Checked on the layout that comes with the quoteConfirmed again in the 3D model before steel is cut
What Moves the Cost of a Prefab Steel Warehouse
The cost of a prefab steel warehouse depends on span, wind and snow loads, crane tonnage and local code, with insulation, doors, windows and a mezzanine adding to the scope. Every building is engineered to its site, so the price is confirmed in your quote rather than published as a rate. A cold storage building costs more than a standard warehouse because of insulated panels and refrigeration, and it is quoted per project. Optional items are insulation, a crane track system, facade design and on-site erection guidance, and anchor bolt supply is confirmed in your quote.
| Cost driver | What it changes in the quote |
|---|---|
| Span | Clear spans up to 60 m are standard, and wider halls up to 100 m are engineered per project |
| Wind and snow loads | High wind and snow zones call for a heavier frame and closer purlin spacing |
| Crane tonnage | Provision can be made for a 5 t, 10 t or 20 t overhead crane |
| Local code | Loads, spans and coatings are engineered to the code that applies at your site |
| Insulation | Roof and wall options run from 0.5 mm profiled steel sheet to EPS, rock wool or PU sandwich panel |
| Doors, windows and mezzanine | The quote follows the number of doors and windows and whether a mezzanine floor is added |
Included in the quote
- Steel structure
- Roof and wall panels
- Gutters and downspouts
- Bolts and accessories
- Shop drawings and installation manual
- Export packing and container loading plan
Not included
- Foundation and site preparation
- On-site erection
- Sea freight and insurance
- Inland transport
- Customs clearance, duties and taxes
- Permits
Design Codes and Documents for Warehouse Prefabricated Buildings
Warehouse prefabricated buildings from Xinguangzheng are designed to the code set by the destination country and the project engineer, for example AISC 360, EN 1993, AS 4100, AS/NZS 1170 or GB 50017. These are design codes, not certificates, and loads, spans and coatings are engineered to the code that applies at your site. Structures are designed for a 50-year service life, with maintenance as set out in the maintenance manual.
- AISC 360
- EN 1993
- AS 4100
- AS/NZS 1170
- GB 50017
High wind and snow zones get a heavier frame and closer purlin spacing, so say in the request whether the site is one. The foundation is designed and built locally by the buyer, and we provide the column base reaction data for that design. Final structural, MEP and civil design is confirmed by local professionals for the project.
Steel building drawing sheets, a 3D frame model on a tablet and an open installation manualDocuments you receive
- Shop drawingsSupplied with the shipment for your erector.
- 3D model approval before cuttingThe Tekla 3D model goes to you for approval, and steel is cut only after you approve it.
- Installation manual with free remote guidanceThe manual ships with the kit, remote guidance is free, and on-site erection guidance is optional.
- UT report and photosThe ultrasonic testing report and photos are sent before you pay the balance.
Warehouse Steel Fabrication and Quality Checks
We manufacture warehouse steel in six factories on 12 production lines, with an annual capacity of up to 150,000 tonnes of steel structures, and tonnage sets the production time confirmed in your quote. The manufacturer is Qingdao Xinguangzheng Steel Structure Co., Ltd. (NEEQ: 834422), which is certified by the Canadian Welding Bureau to CSA W47.1 Division 1. The company holds EN 1090 (CE), EAC (GOST 23118-2019), ISO 9001:2015, ISO 14001 and ISO 45001 certification. It also holds China’s Grade I qualifications for steel structure manufacturing and steel structure engineering contracting, and certificate copies are available on request.
Cut and weld
Plate is cut on laser cutting machines and welded by welding robots, with Q355B welded H-section for the primary frame.
Ultrasonic testing and coating thickness
Main welds are tested by ultrasonic testing (UT) and coating thickness is measured before a steel structure building warehouse leaves the factory. All products are controlled under the ISO 9001 system.
Blast and prime
Steel is blast cleaned to Sa2.5 and primed with epoxy zinc-rich primer on an automated coating line, and hot-dip galvanizing is optional.
Reports before the balance payment
The UT report and photos are sent before the balance is paid, and third-party inspection is welcome.
Manufacturing process
Laser cutting of steel plate on a cutting bed
Welding robot welding a steel H-section
Coating thickness measurement on a coated steel beamFrom Dimensions to Delivery: Ordering a Steel Warehouse Kit
Ordering a steel warehouse kit runs in four steps, and a project usually takes 4–12 weeks from consultation and 3D design approval through factory prefabrication to local erection. Production is the part that tonnage changes, so the schedule is confirmed in your quote.
Send dimensions, site and use
Width, length and eave height, the site country and city and the intended use open the request, with any crane, insulation, door, window or mezzanine needs.
Receive layout, specification and quote
A free layout, specification and itemized quote come back first; the 3D model then goes to you for approval, and steel is cut only after that approval.
Production, payment and inspection
Production takes 15–40 days depending on tonnage, confirmed in your quote. Payment is by T/T or L/C, with a 30% deposit and 70% paid before shipment. Before the balance is paid, the UT weld report and photos are sent, and third-party inspection is welcome.
Packing, shipment and erection
The kit is packed on steel pallets with export packing and a container loading plan, and ships from Qingdao Port in 20′GP, 40′GP, 40′HQ or 40′OT containers or as bulk cargo. Sea transit days are confirmed for your destination port in the quote. On-site erection is outside the quote: the installation manual and free remote guidance come with the kit, and on-site erection guidance is optional.
Steel Warehouse Building FAQ
What is a steel warehouse building, and what does Xinguangzheng supply?
A steel warehouse building from Xinguangzheng is a project-designed, factory-prefabricated kit for export: primary and secondary steel, roof and wall panels and accessories. Primary and secondary steel, profiled sheet and wall panels are manufactured in-house, while doors, windows and insulation core material are supplied items. Foundation and site erection are done locally by the buyer.
What is the minimum order size for a steel warehouse building?
Projects start at 3,000 m². Smaller buildings fall outside this supply, and so do turnkey contracts that need the supplier to build the foundation and erect the steel, because only the kit is supplied. State the floor area with your dimensions so the fit is clear before the quote is prepared.
How wide can a steel warehouse building span without interior columns?
Single-span halls without interior columns are standard up to 60 m wide, and clear spans up to 100 m are engineered project by project. A multi-span layout carries the width on interior column lines instead. Bay spacing of 6–9 m can be adjusted to a racking layout, so send the racking plan with the width.
Are taxes, inland transport and site preparation part of a warehouse kit quote?
No: taxes, inland transport and site preparation are all outside the quote. The other excluded items are the foundation, on-site erection, sea freight, insurance, customs clearance, duties and permits. Budget these with your local contractor and forwarder, because the quote is a China factory price for the kit.
Can the roof and walls of a steel warehouse be insulated?
Insulation is available as an option. The standard roof and wall is 0.5 mm profiled steel sheet, and the insulated alternatives are EPS, rock wool or PU sandwich panels. Insulation is also a cost driver, so name the requirement in your request; thermal values are not published on this page.
Can a steel warehouse carry an overhead crane or a mezzanine?
The quote can make provision for a 5 t, 10 t or 20 t overhead crane, and a mezzanine floor can be added. A crane track system is an optional item rather than part of the standard kit. Crane tonnage and the mezzanine are both quote inputs, so state them with the dimensions.
Who builds the foundation and erects a prefab warehouse kit?
Your local contractor does both, because foundation work and on-site erection sit outside the quote. The foundation is designed locally from the column base reaction data provided for the project. For erection, the kit comes with an installation manual and free remote guidance, with on-site erection guidance as an option.
How long does sea transit take after a warehouse kit leaves production?
Sea transit days are not published, because they depend on the destination port; the figure is confirmed in your quote. Production before shipment takes 15–40 days depending on tonnage. Kits load at Qingdao Port, about 1.5 hours from the factory, so name your destination port in the request.
Other Metal Building Types Beyond Warehouses
Building Systems, Design, Construction and Manufacturing for Your Warehouse
Guides
Steel Warehouse Construction Cost Split by Who Prices ItSteel warehouse construction cost split by who prices each line: the factory kit, then footings, slab, erection, freight and duties, plus quote checks.
Warehouse Loading Dock Design for Steel BuildingsWarehouse loading dock design for steel buildings: fleet inputs, dock height, leveler pit timing, yard depth and drainage to settle before construction.
Steel Logistics Distribution Center Building Design ChecksSteel logistics distribution center building design checks: cross-dock or storage type, throughput inputs, column grid, dock wall bracing and future loads.
Fertilizer Storage Warehouse Building for Humid ClimatesFertilizer storage warehouse building design for humid climates: critical humidity by product, bagged vs bulk layout, fire venting and corrosion inputs.
Warehouse quote
Get a Steel Warehouse Building Quote
If you are sourcing a steel structure warehouse for sale, the six details below are what turn an inquiry into a layout and an itemized price. Email them and we reply with a free, no-obligation quote with a layout, specification and full cost breakdown for projects from 3,000 m².
- 1Dimensions — Width, length and eave height, in m or ft
- 2Intended use — The building type and what the warehouse will be used for
- 3Site location and port — Country and city of the site, and the destination port
- 4Crane — Whether an overhead crane is needed, and its tonnage
- 5Insulation — The roof and wall insulation requirement
- 6Mezzanine, doors and windows — Whether a mezzanine is needed, and the number of doors and windows






