Exterior of a single-span steel hangar with profiled roof and wall claddingPrefab steel hangars
Prefab Steel Aircraft Hangars
We manufacture steel aircraft hangars, one type of pre-engineered metal building, as prefab aircraft hangar kits: primary and secondary steel, roof and wall panels and accessories. Clear span depends on the project: a single span up to 60 m is standard, and up to 100 m is engineered per project. Projects start at 3,000 m², and the foundation and erection are done locally by the buyer.
Tell us how wide, long and high the hangar frame must be and which country it will stand in; we reply with a layout, specification and itemized quote at no charge.
Portal frame outline of a steel hangarWidth, length and eave height for your own hangar can be drafted in the building size planner.
- Listed on China's NEEQ since 2015 · 834422
- Founded in 1997
- ISO 9001 · 14001 · 45001
- 130+ countries and regions
Aircraft Hangar Frame Specifications
A steel hangar from Xinguangzheng starts from the frame ranges in the table below, which are the parent-product ranges shared with a warehouse steel building or a steel frame structure workshop. The table is not an aircraft fit chart, and it lists no door or clearance values. Quote inputs are the dimensions, site location and intended use.
Portal frame of a steel hangar| Item | Standard | Option |
|---|---|---|
| Clear span | Single span up to 60 m | Up to 100 m by project-specific engineering |
| Eave height | 6–12 m | Higher on request |
| Bay spacing | 6–9 m | — |
| Primary frame | Q355B welded H-section | Q235B or Q460 |
| Purlins | Galvanized Z or C purlins | Closer purlin spacing in high wind and snow zones |
| Roof and wall | 0.5 mm profiled steel sheet | EPS, rock wool or PU sandwich panel |
| Corrosion protection | Sa2.5 blast cleaning plus epoxy zinc-rich primer | Hot-dip galvanizing |
| Design loads | Engineered to the code that applies at your site | Heavier frame in high wind and snow zones |
| Crane | Quote can allow for a 5 t, 10 t or 20 t overhead crane | Crane track system |
| Mezzanine | Added to the layout when required | Mezzanine floor |
| Design life | 50-year design service life | Maintenance as set out in the maintenance manual |
Metal Airplane Hangars: Single Span, Multi-Span and Crane Provision
An airplane hangar structure is chosen on two points: how wide the column-free floor must be, and whether interior columns are acceptable. A column-free single span is standard up to 60 m and project-engineered up to 100 m, while a multi-span frame with interior column lines can keep each span in the standard range. State single or multi-span in your request; span is a price driver, so have both quoted from the same brief when either would work. This page lists no aircraft types or clearance values.
Cross-section of a single-span steel frame with no interior columnsSingle clear span
No interior columns cross the width; the choice when the whole width must stay column-free, with the span set by project engineering beyond 60 m.
Cross-section of a multi-span steel frame with interior column linesMulti-span
Interior column lines divide the width into several spans; the choice when the total width is larger and a column-free floor across it is not required.
Section of a steel frame with an overhead crane beamOverhead crane provision
The quote can provide for a 5 t, 10 t or 20 t overhead crane, and crane tonnage is one of the price drivers. A crane track system is optional. Uses that call for it include aircraft maintenance hangars.
Diagram of a steel column baseFrame and foundation scope
- Frame form
- Single or multi-spanOne of the quote inputs
- Mezzanine
- Can be addedCounted among the price drivers
- Foundation
- Buyer’s local design and constructionColumn base reaction data is provided for the foundation design
Aircraft Hangar Buildings: What Drives the Cost
Aircraft hangar steel buildings are quoted project by project at China factory prices that exclude ocean freight, and this page lists the price drivers without publishing a rate. Insulation, a crane track system, facade design and on-site erection guidance are optional, and anchor bolt supply is confirmed in your quote. A hangar below 3,000 m², or a turnkey project that needs the supplier to build the foundation and erect the frame, is simpler to buy from a local contractor.
| Cost driver | What moves the number |
|---|---|
| Clear span | A single span up to 60 m is standard, and a wider span up to 100 m is engineered per project |
| Wind and snow loads, local code | High wind and snow zones call for a heavier frame and closer purlin spacing, set by the code that applies at the site |
| Crane tonnage | Provision can be made for a 5 t, 10 t or 20 t overhead crane |
| Insulation | Roof and wall options run from 0.5 mm profiled sheet to EPS, rock wool or PU sandwich panel; for temperature-controlled storage, PU sandwich panels are quoted as an optional item for a cold storage building |
| Doors and windows | The quote follows the door and window count |
| Mezzanine | A mezzanine floor added to the layout adds to the scope |
Included in the quote
- Primary and secondary steel
- Roof and wall panels
- Gutters and downspouts
- Bolts and accessories
- Shop drawings and installation manual
- Export packing and loading plan
Not included
- Foundation and site preparation
- Site erection
- Ocean freight, insurance and inland transport
- Customs clearance, duties, taxes and permits
Metal Hangar Building Design Codes and Loads
A metal hangar building from Xinguangzheng is designed to the code set by the destination country and the project engineer. These are design codes, not certificates, and the four below, together with AS/NZS 1170, are in common use.
- AISC 360
- EN 1993
- AS 4100
- GB 50017
Loads, spans and coatings are engineered to the code that applies at your site, and high wind and snow zones get a heavier frame and closer purlin spacing. AS/NZS 1170 covers structural design actions in Australia and New Zealand, and whether it applies is set by the destination country and the project engineer. Fire and building code requirements depend on the local authority at your site, and permits are outside the quote. The final structural, services and civil design is confirmed by the local professionals for your project.
Four-step flow from destination code and loads to 3D model approval and shop drawingsWhat you receive
- Layout, specification and itemized quoteFree, and sent first.
- 3D model approval before cuttingThe Tekla 3D model goes to you for approval, and steel is cut only after you approve it.
- Shop drawings and installation manualSupplied with the shipment for your erector.
- UT report and photosThe ultrasonic testing report and photos are sent before you pay the balance.
Steel Aircraft Hangars: Manufacturing and Quality Control
We manufacture steel aircraft hangars under an ISO 9001:2015 quality system, in six factories with 12 production lines and an annual capacity of up to 150,000 tonnes of steel structures. The manufacturing company, Qingdao Xinguangzheng Steel Structure Co., Ltd., is certified by the Canadian Welding Bureau to CSA W47.1 Division 1 and holds EN 1090 (CE), EAC (GOST 23118-2019), ISO 14001 and ISO 45001 certification. It also holds China’s Grade I qualifications for steel structure manufacturing and steel structure engineering contracting, and certificate copies are available on request. Xinguangzheng has supplied an aircraft hangar in Australia, recorded by country and building type only.
Cutting and welding
Plate is cut on laser cutting machines and welded by welding robots, with Q355B welded H-section for the main frame.
Weld testing
Main welds are tested by ultrasonic testing (UT), and coating thickness is measured before the steel leaves the factory.
Blast and prime
Steel is blast cleaned to Sa2.5 and primed with epoxy zinc-rich primer on an automated coating line, and hot-dip galvanizing is optional.
Check before final payment
The UT report and photos reach you before you pay the balance, and third-party inspection is welcome.
Manufacturing process
Illustrative laser plate cutting
Illustrative robotic welding of structural steel
Illustrative coating-thickness inspection on a steel beamFrom Hangar Brief to Container Loading
A prefab airplane hangar has two time figures: factory production of 15–40 days depending on tonnage, which we confirm in your quote, and a whole-project time. A whole project usually runs 4–12 weeks across consultation, 3D design approval, factory prefabrication and local erection.
Requirements
The brief covers the building use, width, length and eave height, site country and city, and single or multi-span. Crane tonnage, insulation, door and window count, mezzanine and any high wind or snow zone complete it.
Quotation
A free layout, specification and itemized quote for the hangar kit comes first. Payment is by T/T or L/C, with a 30% deposit and 70% paid before shipment.
Design and fabrication
The Tekla 3D model goes to you for approval, and cutting starts only after approval. Factory production takes 15–40 days depending on tonnage.
Export and site
Steel is packed on steel pallets with export packing and a loading plan, and ships from Qingdao Port, about 1.5 hours from the factory. Sea transit time is confirmed for your destination port in the quote. On-site erection is outside the quote; an installation manual and free remote guidance are provided, and on-site erection guidance is optional.
Steel Aircraft Hangar Questions
What is the minimum project size for steel aircraft hangars, and when is a kit the wrong choice?
Projects start at 3,000 m². Smaller buildings fall outside this supply, and so do turnkey contracts that need the supplier to build the foundation and erect the frame on site. The kit covers primary and secondary steel, roof and wall panels and accessories only, so a local foundation contractor and erector must be part of your plan.
How do I compare a prefab aircraft hangar quote with a local turnkey price?
Compare the two on the same scope: the kit quote is a China factory price and leaves out ocean freight. Add the items on the Not included list to it: foundation, erection, freight, insurance, inland transport, customs, duties, taxes and permits. Check as well whether insulation or a crane track system was priced as an option.
Which parts of the hangar schedule depend on the buyer?
Three parts do. Steel is cut only after you approve the Tekla 3D model, so cutting waits on your approval; production itself takes 15–40 days depending on tonnage. Foundation and erection are arranged with your local contractor. Sea transit is confirmed for your destination port in the quote, so name the port in your request.
What packing and container types does a hangar kit ship in?
Components are packed on steel pallets with export packing and a loading plan. Shipment is in 20′GP, 40′GP, 40′HQ or 40′OT containers, or as bulk cargo, from Qingdao Port, about 1.5 hours from the factory. Ocean freight, insurance and inland transport are not included in the quote.
What should I check in the 3D model before I approve it?
Approving the Tekla 3D model releases the steel for cutting, so use the model as your check against the brief. Compare its width, length and eave height, single or multi-span layout, crane tonnage, door and window count and any mezzanine with what you sent. Raise any difference before you approve.
Does the 50-year design life of the steel frame mean no maintenance?
No. The 50 years is a design service life that assumes maintenance as set out in the maintenance manual, so read the figure together with that upkeep. Plan the maintenance into your operating budget, and ask other suppliers what maintenance their stated life assumes. Hot-dip galvanizing is an option for corrosion protection.
Other Steel Building Types Beyond the Aircraft Hangar
Building Systems, Design, Construction and Manufacturing for Your Hangar
Guides
Aircraft Hangar Construction Cost Beyond the Kit QuoteAircraft hangar construction cost goes past the kit quote. Sort span, door, loads, foundation and freight into three budget layers before comparing.
Aircraft Hangar Design: What to Settle Before the FrameAircraft hangar design starts from aircraft data, door choice, airport height limits, floor loads and soil. See who confirms each input before the frame.
Aircraft Hangar Size Chart: Real Examples in Feet and MetersAircraft hangar size chart of real airport hangars in feet and meters, with door width, usable area and bay depth checked against wingspan and…
Aircraft Maintenance Hangars Start From the Repair TasksAircraft maintenance hangars are specified from the repair work inside: jack loads, clear height under hung items, cranes, utilities and fire grouping.
Hangar quote
Get a Steel Aircraft Hangar Quote
Comparing steel aircraft hangars for sale starts with the six details below, and we return a layout, specification and itemized quote built on them. Email them together, with the hangar dimensions and site country first.
- 1Building type and use — The building type and how the hangar will be used
- 2Width × length × eave height — In m or ft
- 3Site country and city — With any high wind or snow zone
- 4Single or multi-span — Whether interior columns are acceptable
- 5Crane tonnage — Whether an overhead crane is needed, and its tonnage
- 6Insulation, doors, windows, mezzanine — Roof and wall insulation, door and window count, and any mezzanine