Pre-engineered steel buildings · Qingdao, China · Since 1997

Metal Roofing Systems for Pre-Engineered Steel Building Kits

Metal roofing systems from Xinguangzheng are supplied as profiled steel roof panels, galvanized Z or C purlins, gutters, downspouts, bolts and accessories in a pre-engineered building kit. The specification depends on insulation, design loads and the code at your site. We manufacture the panels and purlins, while foundation and installation are done locally.

  • 0.5 mm profiled steel sheet
  • Sandwich panel option: EPS, rock wool or PU

Send the building width, length, eave height, site country and roof insulation requirement, and we reply with a free layout, specification and itemized quote for the roof package.

Exterior of an industrial steel building with a profiled steel roof, eave gutter and downspoutExterior of an industrial steel building with a profiled steel roof, eave gutter and downspout

Metal Building Roof Scope Within Metal Roofing Systems

A metal building roof in a Xinguangzheng kit is one layer of the pre-engineered package: profiled steel roof panels, galvanized Z or C purlins, gutters, downspouts, bolts and accessories are all on the supply list.

We manufacture the profiled sheet and the purlins, and the buyer’s local contractor builds the foundation and installs the roof on site. Projects under 3,000 m², or projects where the supplier must install the roof under a turnkey price, are outside this kit. Where turnkey installation is the requirement, a local contractor is the more direct route. Xinguangzheng’s metal building projects include factories in Algeria, Ethiopia, Pakistan, Sri Lanka and Jamaica.

Metal Building Roofing Components: Panels, Purlins, Gutters and Downspouts

Metal building roofing in this supply comes down to the three components below, and bolts and accessories are on the supply list too. Fastener type, sealing and flashing details are not published on this page. Ask for them with your RFQ.

Eave cut-away of a steel building roof showing the roof sheet, purlins, steel frame, gutter and downspoutEave cut-away of a steel building roof
Roof componentWhat the supply coversDepends on
Roof panels0.5 mm profiled steel sheet, with sandwich panels (EPS, rock wool or PU) as an optionInsulation requirement and project design loads
PurlinsGalvanized Z or C purlinsPurlins are denser in high wind or snow zones
Gutters and downspoutsIncluded in the standard supply listMaterial and size are not published on this page; ask for them with your RFQ

Loads, spans and coatings are engineered to the code that applies at your site.

A roof without an insulation requirement can use the 0.5 mm profiled steel sheet. When insulation is required, the quote request should say so, and sandwich panels in EPS, rock wool or PU are quoted for the roof. The insulation scheme is one of the price drivers, so the choice between the two builds changes the itemized quote. A site in a high wind or snow zone changes the roof as well, because purlins are denser there. Roof color can be previewed together with the wall and trim colors in the exterior metal building color visualizer; screen colors are approximations, confirmed against physical samples and the quote.

ToolEnvelope and insulation selectorPlanning aid · panel type, core thickness and fire data are confirmed in the quote

Estimate for planning only, from a steady-state check with generic material values. We manufacture the profiled sheet and supply the insulation core. Panel type, core thickness, fire data and vapor control are confirmed in the written quote.

Explore the full envelope and insulation selector for the assumptions and planning guidance.

PEMB Roof Supply Scope, Approval Steps and Quote Inputs

The table below sorts a PEMB roof supply into included, optional and not-included items and its interfaces with local work.

ScopeWhat it coversNote
IncludedEverything in the roof components table, plus bolts, accessories, shop drawings, installation manual, export packing and a packing planAnchor bolt supply is confirmed in your quote
OptionalInsulation and on-site installation guidanceListed in the itemized quote
Not includedFoundation, on-site installation, ocean freight, customs clearance, duties, taxes, insurance, inland transport, permits and site preparationDuty and permit rules vary by destination country
InterfacesFoundation designed and built locally; column base reaction data, installation manual and free remote guidance suppliedFinal structural, mechanical-electrical and civil design is confirmed by your local professional

Roof pricing for metal roofing systems moves with the insulation scheme, span, wind and snow loads and the local code, so this page gives no price per square meter. The free quote returns the layout, specification and itemized price.

  1. Quote: a free layout, specification and itemized quote follows your inputs, for matching roof panel type and insulation against your request.
  2. 3D model approval: we send a Tekla 3D model for your confirmation before steel is cut; compare panels, purlins, gutters and downspouts against it.
  3. Production: 15–40 days by tonnage, confirmed in the quote; a project typically runs 4–12 weeks.
  4. Payment terms: T/T or L/C, 30% deposit, 70% before shipment; the UT weld inspection report and photos reach you before the balance; third-party inspection is welcome.
  5. With the shipment: shop drawings, the installation manual, the UT report and photos travel with the order for your local installer.

UT reports and coating thickness checks cover the main welds and coating of the steel structure. Inspection items specific to roof panels are not published, so the panel and purlin inspection scope is worth raising with the quote request. Third-party inspection before the balance is welcome for the roof panels too. The deposit due date is also unpublished and belongs in that request.

  1. Building type and use
  2. Width × length × eave height
  3. Site country and city
  4. Single span or multi-span
  5. Roof and wall insulation requirement
  6. High wind or snow zone

Tell us if the roof needs EPS, rock wool or PU sandwich panels and if the site is in a high wind or snow zone, and we price the roof portion around both.

Ask for Roof Pricing

Metal Roofing by Building Type: Warehouses, Hangars and Industrial Buildings

The roof package is the same kit item for every building type; the site exposure and the building use decide the frame loads and the insulation that go into the quote.

  • Warehouses

    On a steel warehouse frame, the standard roof is 0.5 mm profiled steel sheet, with EPS, rock wool or PU sandwich panels as insulated alternatives; high wind and snow zones get a heavier frame and closer purlin spacing.

  • Hangars

    Metal hangar buildings keep the whole width column-free, and loads, spans and coatings are engineered to the code at your site, so the roof load case comes from the site, not a standard table.

  • Industrial buildings

    For steel industrial buildings, insulation is an optional item and a cost driver, so the roof requirement belongs in your inquiry.

Pre-Engineered Metal Building Roof Beside the Other Building Systems

The roof sits in the kit beside wall panels, optional insulation and the steel frame, and each page below covers one building system.

Metal Roof Supply Questions: Order Size, Codes, Checks and Shipping

What is the minimum project size for metal roofing systems?

Projects start at 3,000 m², so a roof for a building under that area is outside this export supply. Above that size, send the width, length, eave height and site country, and the free quote confirms the roof layout, specification and itemized price, with foundation and installation handled by a local contractor.

Which codes is the roof designed to, and who confirms the final design?

Design follows the code of the destination country, set with the project engineer and commonly AISC 360, EN 1993, AS 4100, AS/NZS 1170 or GB 50017. The roof is designed to that code, not certified to it. Final structural, mechanical-electrical and civil design is confirmed by the local professional for your project.

Which quality system covers the roof panels and purlins?

Xinguangzheng manufactures the profiled sheet and the purlins, and all products are managed under an ISO 9001 quality system. Factory inspection named for the steel structure is ultrasonic testing of main welds plus coating thickness measurement. How far those checks reach for roof panels is set out after the approval steps above.

How is the roof packed and shipped, and how long is transit?

Each order is bundled on steel pallets with export packing and a packing plan, and ships from Qingdao port. Sea transit days depend on the destination port and are confirmed in the quote, so the port belongs in the quote request alongside the building size.

Who installs the roof, and what support comes with the order?

On-site installation is not in the quote, so a local contractor installs the roof using the installation manual and the free remote guidance included with the order. On-site installation guidance can be added as an optional item and is then listed in the itemized quote.

Which certifications and capacity stand behind the roof supply?

Qingdao Xinguangzheng Steel Structure Co., Ltd. (NEEQ: 834422) is certified by the Canadian Welding Bureau to CSA W47.1 Division 1. It holds EN 1090 (CE), EAC (GOST 23118-2019) and ISO 9001:2015 certification. Annual capacity is up to 150,000 tonnes of steel structures across six factories, and certificate copies are available on request.

Does the building design life apply to the roof?

The building is designed for a 50-year service life, with maintenance as set out in the maintenance manual. That is a building-level design life, not a service life for roof panels or coatings, and no roof-specific life figure is published here. Loads, spans and coatings are engineered to the code that applies at your site.

How does a high wind or snow zone change the roof specification?

Frames are heavier and purlins are denser in a high wind or snow zone, with loads engineered to the code that applies at your site. Wind and snow loads are also a price driver, so the quote request needs the site country, city and zone. Wind speed, uplift and slope figures are not published here.

Send Your Metal Roof Inputs for a Written Quote

For metal roofing systems, send the six inputs from the supply scope section. We return a free layout, specification and itemized quote for the roof, with the 3D model for your confirmation before steel is cut. Email [email protected] or use WhatsApp, which opens with the roof project line pre-filled.

Palletized roof sheets and purlins in a yard beside an empty building sitePalletized roof sheets and purlins in a yard

Free quote

Get a Steel Building Quote

Send width × length × eave height and the site country. We return a free, no-obligation quote with a layout, a specification and a full cost breakdown, for projects from 3,000 m².

No Choosen File
(Max 2 MB)

Prefer direct contact? WhatsApp · [email protected]

English (US)

WhatsApp or call

Chat with a steel building engineer

Send span, length, eave height and the site country. An engineer replies within 24 hours, Monday to Saturday (GMT+8).

Scan with your phone
WhatsApp / phone +86 183 6628 8508
Open WhatsApp chat

Prefer a written quote? Request a quote online · Email us

Email

Email your project details

Write to our engineering team. Drawings and site photos are welcome, but size and location are enough to start.

Helpful to include

Prefer a form? Request a quote online · WhatsApp