Pre-engineered steel buildings · Qingdao, China · Since 1997

Metal Building Erection: Kit Delivery and Remote Guidance for Local Contractors

Xinguangzheng supplies metal building kits with erection drawings, an installation manual and free remote guidance, and metal building erection on site is done by the buyer’s local contractor. Loads, spans and coatings depend on the code that applies at your site. We manufacture the frames and panels and ship the kit on steel pallets from Qingdao port.

  • Drawings and manual ship with the kit
  • Local contractor erects on site

Send the width, length, eave height and site country of your project, and we reply with a free layout, specification and itemized quote. The quote spells out which installation guidance it includes and which work stays with your local contractor.

Bundled steel building members on steel pallets beside an open shipping container

Metal Building Erection Support: What We Deliver and What Your Local Contractor Builds

Your local team does the metal building erection and builds the foundation from our column base reaction data. The drawings and installation manual ship with the kit.

Foundation and on-site erection are not in the quote. A buyer who wants one supplier to build the foundation and erect the steel at a turnkey price is not served by kit supply.

Support topicWhat it coversOpen it when
Cutaway of a shipping container loaded with pallet-bundled steel members on steel pallets
Steel structure packing and shipping
Steel pallet bundling, export packing and a container loading plan, shipped from Qingdao portYou are planning containers and port handling
Printed erection drawings and an installation manual beside a laptop showing a 3D steel frame model
Steel building installation guide
Drawings, installation manual and free remote guidance, with on-site guidance as an optionYou are briefing your local contractor

Name the site country and whether on-site guidance should be an option, and we list it in the quote.

Ask About Site Guidance
  1. Four factories, up to 150,000 tonnes a year

    We manufacture the structure with laser cutting, welding robots and an automatic coating line.

  2. Weld and coating checks

    Main welds are ultrasonically tested, and coating thickness is measured. Design service life is 50 years with maintenance per the manual.

  3. Certificates on request

    Qingdao Xinguangzheng Steel Structure Co., Ltd. is certified by the Canadian Welding Bureau to CSA W47.1 Division 1 for steel structure welding. It holds EN 1090 (CE) for steel structures exported to Europe, EAC (GOST 23118-2019) for those exported to Russia and the Eurasian Economic Union, and ISO 9001:2015. Certificate copies are available on request.

Erection Questions: Scope, Documents, Shipping and Payment

Who handles metal building erection after the kit reaches my site?

Your local contractor does the metal building erection, because on-site installation is not part of the quote. Xinguangzheng provides the installation manual and free remote guidance, and on-site installation guidance can be listed as an option, with its scope confirmed when you enquire. If the manual and remote guidance are enough, leave the option out.

What does the metal building kit include?

The kit includes the steel structure, roof and wall panels, gutters and downpipes, bolts and accessories, erection drawings, the installation manual and export packing with a container loading plan. The main frame is welded H-section in Q355B steel, with Q235B or Q460 available, with galvanized Z and C purlins. Anchor bolt supply is confirmed in your quote.

Which costs sit outside the kit quote?

Foundation, on-site erection, ocean freight, customs clearance, duties and taxes, insurance, inland transport, permits and site preparation are all excluded from the quote. The kit price moves with span, wind and snow load, crane tonnage and local code, plus insulation, door and window count and any mezzanine. The figure itself is set in a written quote after engineering review.

Who prepares the erection drawings, and can I check the model before steel is cut?
How long does production take, and how long is a whole project?

Production takes 15 to 40 days depending on tonnage, and the exact figure is confirmed in the quote. A whole project typically runs 4 to 12 weeks, which covers consultation, 3D design confirmation, factory prefabrication and local installation. Ocean transit days are confirmed in the quote by destination port, so ask for that figure when you enquire.

How do payment and pre-shipment inspection work?

Payment is by T/T or L/C, with a 30% deposit and the remaining 70% paid before shipment. Before the final payment, Xinguangzheng sends the UT weld inspection report and photos, and third-party inspection is welcome. The inspection evidence therefore reaches you before the last transfer, while the steel is still in the factory.

What is the minimum project size for a metal building kit?

Projects start at 3,000 m², and a small shed or garage below that area is not what this supply is built for. Above it, a single span with no interior columns typically reaches 60 m, and wider spans of up to 100 m are engineered per project, so give the building width when you enquire.

Which building code does the kit follow, and who handles permits?

Loads, spans and coatings are engineered to the code that applies at your site, which the project engineer sets for each project. Codes in common use include AISC 360, EN 1993, AS 4100, AS/NZS 1170 and GB 50017, and the kit is designed to them rather than certified to them. Permits are not included in the quote.

Which countries have you supplied metal building projects to?

Xinguangzheng has supplied factories in Algeria, Ethiopia, Pakistan, Sri Lanka and Jamaica, warehouses in Australia and Algeria, showrooms in Uruguay, Brazil, the Netherlands and Aruba, and an office building in the Solomon Islands. Xinguangzheng has customers in 100+ countries and regions, and project areas and years are not listed here.

Send Your Building Size and Site Country for a Kit Quote

To quote the kit, send the building type and use, width, length and eave height, and the site country and city. Add single or multi-span, crane tonnage, insulation, door and window count, any mezzanine and whether the site has high wind or snow. We return a free layout, specification and itemized quote, and the 3D model comes to you for confirmation before any steel is cut.

Site plan and building layout sketch with dimension marks on a desk