Twin 26×108×8m Steel Factory Sheds in Tanzania With Zero-Fan Ridge Ventilation

6 min read
Twin 26×108×8m Steel Factory Sheds in Tanzania With Zero-Fan Ridge Ventilation

The twin sheds use passive ridge ventilation to release heat from the extrusion lines. A light-manufacturing and packaging plant operator in Dar es Salaam ordered twin 26 × 108 × 8 m steel factory sheds in Tanzania to clear that heat passively. The twin halls total 5,616 m², and full-length throat ridge ventilators with louvered sidewall intakes provide a path for stack-effect airflow. Oversized 300 mm galvanized box gutters with dual-side PVC downspouts along both facing inner eaves are sized for the Vuli and Masika downpours. Fabrication ran 45 days ex-works; 178 tons arrived CIF Dar es Salaam on June 12, 2026, and both roofs closed before the November rains.

Project ParameterProject Specification
Client Sector & RegionLight-manufacturing & packaging plant operator, Dar es Salaam, Tanzania
Building Scope2 sheds × 26 m (W) × 108 m (L) × 8 m eave; 5,616 m² combined footprint
Structure & SteelSingle-span tapered portal frames; Q355B welded H-sections, Sa2.5 blast + zinc-rich epoxy; Z275 galvanized purlins
Roof & Ventilation0.5 mm alu-zinc roof sheets + foil insulation; full-length throat ridge ventilators + louvered sidewall intakes
Rainwater DrainagePaired 300 mm galvanized box gutters + dual-side PVC downspouts along the facing inner eaves
Design Loads & Codes120 km/h coastal wind; Seismic Zone 2; Tanzania TBS / TZS + Eurocode EN 1993
Tonnage & Containers178 t in 9 × 40’HQ (about 19.8 t each), packed 4+4+1 by erection zone
Lead Time & Delivery45-day ex-works fabrication; CIF Dar es Salaam Port from Qingdao, delivered June 12, 2026

Machine Heat, Salt Humidity and Two Rainy Seasons

The plant’s heat problem starts indoors. Extrusion lines for light manufacturing and packaging run through the afternoon, and the machines dump their heat straight into the hall. Foil insulation under the 0.5 mm alu-zinc roof reduces radiant heat gain. It cannot remove the heat released by machines inside the building. Without adequate heat removal, machine heat can raise the hall temperature during a shift.

Wall-mounted exhaust fans are the usual answer, and they bring their own costs. Every fan adds a motor to power, service and protect against coastal humidity. The owner wanted the heat out without adding a fan power bill.

Dar es Salaam adds two more constraints. Salt-laden coastal humidity attacks exposed steel. The frames are designed for a 120 km/h coastal wind and Seismic Zone 2, with Tanzania TBS / TZS and Eurocode EN 1993 as design references. Rain arrives in two seasons: the Vuli short rains from October to December and the Masika long rains from March to May. Two parallel roofs sloping toward each other concentrate runoff into the gap between the sheds, exactly where trucks need to pass.

The layout brief was strict: two identical halls, each 26 m wide and 108 m long, had to stay free of interior columns. The 26 m clear span crosses each hall in one tapered portal frame. Frame columns stand only along the sidewalls, so the full 108 m production length stays open for lines and forklift routes.

Stack-Effect Airflow From Louvers to Ridge Throat

Louvered sidewall intakes sit low on both long walls. Outside air enters at working level, absorbs machine heat along the extrusion lines and rises toward the roof apex. The vertical separation between the low-level intakes and the ridge outlets provides the effective stack height. When indoor air is warmer than outdoor air, the resulting buoyancy pressure drives airflow toward the ridge outlets.

Column-free 26 m extruder hall in Dar es Salaam with throat ridge ventilators and louvered sidewall intakes

Full-length throat ridge ventilators run along the whole 108 m ridge of each shed, giving rising machine heat a high-level escape path above every production bay. Actual airflow depends on intake and outlet areas, the indoor-outdoor temperature difference and wind conditions. The ventilators are passive, with no motors or wiring, so heat exhaust draws no fan power from the plant’s 230/400 V, 50 Hz supply. The extrusion lines are the owner’s own equipment, separate from our steel building package.

The same physics governs any ventilation design for pre-engineered metal buildings: intake area, throat size and stack height must be sized together.

Paired 300 mm Box Gutters Along the Truck Corridor

Each shed’s inner roof slope drains toward the shared truck corridor. The two facing 108 m inner eaves therefore need coordinated gutter and downspout drainage to keep roof runoff off the truck route.

Section diagram of twin factory sheds showing stack-effect airflow and 300 mm box gutters with dual-side PVC downspouts

Oversized 300 mm galvanized box gutters run along the facing inner eaves, sized for the Vuli and Masika downpours. Galvanizing protects the steel, but salt deposits and persistent moisture can still accelerate coating loss. Dual-side PVC downspouts drop the collected water by gravity along both sides of the corridor, splitting the flow instead of routing it all to one end of the 108 m run. Box section, fall and downspout spacing work together in the metal building gutter details for the paired inner eaves.

During a cloudburst, spilled water at these eaves would soak loading operations between the halls. Keeping roof discharge out of the corridor protects the loading route from roof runoff.

Portal Rafters Split for Nine Numbered 40’HQ Containers

Each portal frame is fabricated from Q355B welded H-sections, tapered to follow the bending moment diagram. Two rafters meet at the ridge to cross the 26 m span. A single rafter runs about 13 m from eave to ridge, longer than the project container packing limit of 11.8 m for a 40’HQ container. Every rafter therefore ships as bolted segments of 11.7 m or less. Shop-welded end plates meet on site with grade 10.9S high-strength friction-grip bolts.

Frames were blasted to Sa2.5 and coated with zinc-rich epoxy primer against the coastal atmosphere. Purlins are Z275 galvanized Z-sections. All members were detailed in Tekla 3D, and cutting was released only after the client’s signed model approval.

Steel pallets bundle the members for export, and the nine containers were numbered by erection zone. Containers 1–4 carry Shed A (Shed One) frames, containers 5–8 carry Shed B (Shed Two) frames, and container 9 holds the shared cladding and gutters. The 178 tons distribute to roughly 19.8 t per 40’HQ. Shop fabrication and export packing took 45 days ex-works before vessel departure from Qingdao, excluding ocean transit, port clearance and site erection. The shipment arrived CIF Dar es Salaam on June 12, 2026, then moved by short road haul to the industrial zone.

Dry-Season Bolting and Roofs Closed Before Vuli

Site erection ran through the July–August 2026 dry window, on foundations prepared by the owner’s local team. Zone-numbered containers let the crew unload and bolt up Shed One straight off the pallets, without waiting to sort mixed bundles.

The erection plan grouped the nine containers by shed so the crew could assemble one hall before moving to the next.

Once both frames were bolted by late August, the cladding and 300 mm box gutters packed together in container 9 closed both envelopes ahead of the Vuli short-rain season. Line installation and production start followed under dry cover, meeting the owner’s target of launching before the November rains.

Where This Ridge-Ventilated Shed Design Fits

  • Steady internal heat sources: Stack ventilation performs best where machines release heat continuously, such as extrusion, molding or curing lines. The warmer the hall runs above ambient, the stronger the buoyancy draft.
  • Honest limits: When lines run at light load on windless days, the indoor-outdoor temperature difference drops and buoyancy flow slows. Passive ventilation also cannot cool the hall below outside air temperature, so processes needing guaranteed air changes or sub-ambient cooling still require mechanical systems.
  • Parallel-shed drainage: Paired oversized corridor gutters suit two or more parallel buildings with a service aisle between them. A single isolated hall drains to perimeter gutters instead.
  • Column-free production layout: The 26 m single-span portal keeps the 108 m hall usable end to end. Wider spans or overhead crane loads require a separate structural assessment.

If your facility deals with continuous process heat and heavy seasonal rainfall, send us the layout, the equipment heat list and your site’s rainfall context. Our engineers will model the frame grid, size the ridge throat and box gutters, and return a Tekla-based proposal. Column-free portal frames keep production routes open in these industrial steel buildings; contact us directly with your drawings.

Get a quote for your steel building

  1. 1Send size and site country
  2. 2Receive layout and itemized quote
  3. 3Approve the 3D model before cutting
No Choosen File
(Max 2 MB)

Prefer to talk first? WhatsApp an Engineer

Related articles

Send your building size for a free layout and itemized quote

Projects from 3,000 m². Kit exported from Qingdao, erected by your local contractor.

Free quote

Get a Steel Building Quote

Send width × length × eave height and the site country. We return a free, no-obligation quote with a layout, a specification and a full cost breakdown, for projects from 3,000 m².

Prefer direct contact? WhatsApp · [email protected]

English (US)

WhatsApp or call

Chat with a steel building engineer

Send span, length, eave height and the site country. An engineer replies within 24 hours, Monday to Saturday (GMT+8).

Scan with your phone
WhatsApp / phone +86 183 6628 8508
Open WhatsApp chat

Prefer a written quote? Request a quote online · Email us

Email

Email your project details

Write to our engineering team. Drawings and site photos are welcome, but size and location are enough to start.

Helpful to include

Prefer a form? Request a quote online · WhatsApp